Loading…
Loading…
15 results • Recent activity
Material Code-842020136701Material Description-BOTTOM COVER ASSEMBLY MODIFIED, Material Code- 842020136801Material Description-RACK COVER MODIFIED, Material Code-842020115801Material Description-GUARD ASSEMBLY MODIFIED, Material Code- 842020115800Material Description-GUARD ASSEMBLY- 20003900, Material Code-842020136700Material Description-BOTTOM COVER ASSEMBLY-20025700, Material Code-842020136800Material Description-RACK COVER- 20024300
COMP-FLANGE_ SOW_ 10_ C150_ SA105-K004, GL FLANGE- A105-1370, RAMP CAM - BS970 817M40 (EN24)
Siemens Control card (spare) for CNC HBM (M/c no. 88)
RACK GEAR HOUSING-O0000400 - Material code 842020111100 - Drawing no O2020100004 Rev 18, RACK GEAR HOUSING -MODIFIED - Material code 842020111102 - Drawing no O2020100120 Rev 00, SWITCH MOUNT CONNECTOR-20006100 - Material code 842020111200 - Drawing no 22020100061 Rev 03, SWITCH MOUNT CONNECTOR -MODIFIED - Material code 842020111201 - Drawing no 22020100510 Rev 00, BEARING CAP -MODIFIED - Material code 842020112601 - Drawing no 42020104040 Rev 01, GEAR HOUSING-O0004800 - Material code 842020113200 - Drawing no O2020100048 Rev 08, GEAR HOUSING -MODIFIED - Material code 842020113201 - Drawing no O2020100119 Rev 00, GEAR BOX COVER- 20006000 - Material code 842020113300 - Drawing no 22020100060 Rev 04, BEARING FRAME-MODIFIED - Material code 842020113401 - Drawing no 22020100512 Rev 00, LIMIT SWITCH MOUNT-20035700 - Material code 842020139700 - Drawing no 22020100357 Rev 07, LIMIT SWITCH MOUNT -MODIFIED - Material code 842020139703 - Drawing no 22020100508 Rev 00
ACTR SA15A32/32R, NON. INTR, MODBUS, CEPT-AI (Material Code - 969991891200)
Standard Storage Container or Cargo or Container Ships (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7101487 Dated : 14-01-2026 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 90 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No