Loading…
Loading…
22 results • Latest
Construction of compound wall in the Market Yard, Kalikiri Annamayya District
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth
Establishment of New Rythu Bazaar at Piler Village under AMC, Piler of Annamayya District
Earth work excavation in foundation for Buildings and depositing the earth on bank with an initial lead of 10 M and lift of 2 M in loamy, clayee soils like Black Cotton, red earth, ordinary gravelly soils excluding rock, including shoring, strutting, sheet planking, and bailing out water etc., dressing the bottom of foundation with uniform surface in all directions and thoroughly rammed before laying of concrete etc., complete. for foundations.
Construction of 10 Nos traders shops for sweet lime traders in sweet lime shed in the Market Yard, Pulivendula of AMC, Pulivendual
Providing of 25mm dia drilling holes in hard rock/concrete upto the depth of 0.15M including cost and conveyance of all materials and labour charges etc., complete
CONSTRUCTION OF NEW RYTHU BAZAR AT SUB MARKET YARD AGIRIPALLI UNDER AGRICULTURAL MARKET COMMITTEE NUZIVID ELURU DISTRICT
BALANCE WORK OF OFFICE BUILDING AGRICULTURAL MARKET COMMITTEE RAJANAGRAM UNDER AGRICULTURAL MARKET COMMITTEE, RAJANAGARAM OF EAST GODAVARI DISTRICT.
Extension, Construction and Providing Drip water sprinkling facility at C-Camp Rythu Bazar, Kurnool of A.M.C, Kurnool in Kurnool District
Earth work excavation and depositing on bank not less than one meter from the outer edges of the excavation, but shall be placed any where within 10mts.lead and 2mts. Lift as directed by the departmental officers in all soils up to excluding ordinary rock forming whenever necessary dressing the bottom of foundations to levels in all direction, well watered and thoroughly rammed before laying concrete etc., complete as per standard specification and as directed by the departmental officers.