Loading…
Loading…
236 results • Latest
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
KB Silver--KOPYBRIGHT INDIA PRIVATE LIMITED 2.18 kilogram Ream of, KB Silver--KOPYBRIGHT INDIA PRIVATE LIMITED 2.18 kilogram Ream of 500 Sheet 70 gsm A4 size Plain Copier Paper
Hopper Tipper Dumper for Garbage (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
High mast pole for national flags (V2) (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Interactive Panels with CPU (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Unbranded Papier Machie Artwork and Paintings-Handicraft
Manpower Outsourcing Services - Fixed Remuneration - Admin; District Coordinator; Graduate, Manpower Outsourcing Services - Fixed Remuneration - AADHAR OPERATOR; AADHAR OPERATOR; High School, Manpower Outsourcing Services - Fixed Remuneration - Admin; Block Coordinator; Graduate, Manpower Outsourcing Services - Fixed Remuneration - Admin; District Project Assistant; Graduate
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Interactive Panels with CPU (Q2) (3 (3 ))
Interactive Panels with CPU (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2), Ethernet Cables (Q2) (3 (3 ))
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Gypsy horn - loud speakers (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7088592 Dated : 08-01-2026 Bid Document 1/8 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 49500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/8 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : TALUKA DEVLOPMENT OFFICER Ahmedabad, Panchayats and Rural Housing Department Gujarat, Ahmedabad District Panchayat, (Tdo Sanand)
Octagonal Pole (V2) (Q3) (3 (3 ))
Fire Hose Cabinet (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Turnover Yes | Complete
Interactive Panels with CPU (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2) (3 (3 ))
Bag filter (Q3) (3 (3 ))
LG Frost Free Refrigerator Training Jig(DVET), Warranty 6, LG Frost Free Refrigerator Training Jig(DVET), Warranty 6 month
Waste Container (V3) (Q4) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Octagonal Pole (V2) (Q3) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
High mast pole for national flags (V2) (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Tanker on Agricultural Trailer (Q2) (3 (3 ))
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Layer 2 Access Switch (V2) (Q2) (3 (3 ))
All in One PC (V2) (Q2)
Paper-based Printing Services - Printing with Material; Question Paper; Offset, Paper-based Printing Services - Printing with Material; Answer Book; Offset, Paper-based Printing Services - Printing with Material; GRAPH AND MAP; Offset
White - LED Based Solar Street Lighting System (Q3) (3 (3 ))
Facility Management Services - LumpSum Based - Government Office; Supply Installation Testing Commissioning of Butterfly Wall; Consumables to be provided by service provider (inclusive in contract cost)
Unbranded Plastic Clear bag folder for 21.5 cm x 34.5 cm (FS), Unbranded Plastic Clear bag folder for 21.5 cm x 34.5 cm (FS) size document