Loading…
Loading…
614 results • Recent activity
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Amtali W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division, PHE Dte.
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including FHTC and Rising main within Zone-X of Diamond Harbour-I Block under Mega Surface Water Based Water Supply Scheme of Falta-Mathurapur. S24Pgs.(for 1year)
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including OHR, Pump house, FHTC, Rising main of Head work site in Zone-VII of Diamond Harbour-I Block under Mega Surface W/S Scheme of Falta-Mathurapur (for 1year)
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including OHR, Pump house, FHTC and Rising main in Zone-VI HW of Diamond Harbour-I Block under Mega Surface Water Based W/S Scheme of Falta-Mathurapur (for 1 year)
Engagement of Valve Operator cum cycle messenger with O and M of distribution pipeline including OHR, FHTC and Rising main pipeline within Zone-IV of Diamond Harbour-I Block under Mega Surface W/S Scheme of Falta-Mathurapur, South-24 Pgs.(for 1 year)
Repair and Renovation of 12.0 M3/ Hr. R.O Plant of Maukhali-Kumarkhali (Zone - II) Water Supply Scheme, Block-Canning-II under Canning Sub-Division of Alipore Division, P.H.E. Dte.