Loading…
Loading…
614 results • Recent activity
Erection of temporary GCI Sheet Walling at Outram Ghat Transit Point in connection with Ganga Sagar Mela-2026 under Alipore Division, P.H.E. Dte. (At Main Math, beside sadhu shed)
Erection of Temporary Shed and GCI Sheet Walling in connection with Ganga Sagar Mela 2026 at Outram Ghat Transit Point under Alipore Division, P.H.E. Dte. (at Bangabasi Math)
Engagement of Mathor/Mazdoor for sweeping and providing generator, dismantling masonry work, removing rubbish etc. and dressing/Chilcheling work at Bangabasi Math, Main Math and Mohun Bagan Math within Outram Transit Point in/C with G.S. Mela 2026.
Spraying fire retardant chemicals over improvise structure to prevent fire hazard at all transit camps setup at Outram Ghat Mela Ground and others in connection with Ganga Sagar Mela-2026 under Alipore Division, P.H. Engineering Dte.
Spraying fire retardant chemicals over improvise structure to prevent fire hazard at all transit camps setup at Mohon Bagan Math, Bangabasi Math and others in connection with Ganga Sagar Mela-2026 under Alipore Division, P.H. Engineering Dte.
Temporary installation and maintenance of Bio-Toilet 06 (Six) Nos. at Outram-Ghat Transit Point in connection with Gangasagar Mela 2026 under Alipore Division, PHE Dte. (Period from 09.01.2026 to 17.01.2026)