Loading…
Loading…
614 results • Recent activity
Operation and maintenance of 26 (Twenty-six) Nos. Integrated Water Supply Scheme already installed in different schools and Habitations under Joynagar-II Block of Raidighi Sub-Division under Alipore Division P.H.E. Dte. (For 12 (twelve) months)
Operation and maintenance of 28 (Twenty-eight) Nos. Integrated Water Supply Scheme already installed in different schools and Habitations under Joynagar-I Block of Raidighi Sub-Division under Alipore Division P.H.E. Dte. (For 12 (twelve) months)
Operation and maintenance of distribution system including rising main and FHTC for Suryanagar Zone-I and Nebutala Piped Water Supply Scheme of Kakdwip Block under Kakdwip Sub Divn. of Alipore Division, PHE Dte. (period from 01.09.2025 to 31.08.2026)
Operation and maintenance of distribution system including rising main and FHTC for Sibnagar and Srikrishnanagar Piped Water Supply Scheme of Kakdwip Block under Kakdwip Sub Divn. of Alipore Division, PHE Dte. (period from 01.09.2025 to 31.08.2026)
Operation and maintenance of distribution system including rising main and FHTC for Nagendraganj and Mrityunjaynagar Piped Water Supply Scheme of Sagar Block under Kakdwip Sub Divn of Alipore Division, PHE Dte. (period from 01.09.2025 to 31.08.2026)
Operation and maintenance of distribution system including rising main and FHTC for Khas Ramkarchar and Krishnanagar Piped Water Supply Scheme of Sagar Block under Kakdwip Sub Divn. of Alipore Division, PHE Dte. (period from 01.09.2025 to 31.08.2026)