Loading…
Loading…
3 results • Latest
Construction of Balance Infrastructure such as internal Roads, Storm water drains, Water Supply, Sewerage network, Court yard filling, Trunk Mains etc., in the approved layouts at Sattenapalli and Tenali II ULB s in Guntur District in Andhra Pradesh under AHP PMAY HFA(U) with 2 years defect liability period under Lump sum Contract.
Construction of Balance Infrastructure such as internal Roads, Storm water drains, Water Supply, Sewerage network, Court yard filling, Trunk Mains etc., in the approved layouts of Nuziveedu, Vuyyuru ULBs in Krishna District and Jaggayapeta, Tiruvuru, Nandigama ULBs in NTR District and Addanki in Bapatla District and Kanigiri, Giddalur ULB s in Prakasam District in Andhra Pradesh under AHP PMAY HFA (U) with 2 years defect liability period under Lump sum Contract.
Construction of Physical Infrastructure such as Internal Roads,Storm water Drains, Culverts, Water supply, Sewerage Network etc at Boddapadu, Palasa ULB and Ameenshahibpeta, Ichapuram ULB in Srikakulam District under PMAY-HFA(U), with 2 years defect liability period under lumpsum Contract
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Mechanical means