Loading…
Loading…
180 results • Latest
Consultancy Services for Post Environmental Clearance Monitoring for Mangalagiri, Head office building as per EC conditions(2nd Call).
Construction of 4 Lane Road from NH 67 to JSW Rayalaseema Steel Plant in Jammalamadugu, YSR Kadapa District.
Operation and Maintenance of existing water supply system (24x7) for IP.Gopavaram, pumping from Bhramasagar reservior to IP- Gopavaram, YSR Kadapa District, Andhra Pradesh for a period of 36 Months (2nd Call).
Laying of BT roads including CD works and retaining wall at IT Yendada, Visakhapatnam Rural Mandal, Visakhapatnam District.
Supplying, laying and Jointing of 250mm dia HDPE external water supply pipeline for a length of 14.00 Km from 95MLD water supply scheme Parawada to MSME Koduru, Koduru, Anakapalli Mandal, Anakapalli District.
Construction of CC Roads for a length of 0.81 KM with 3.75 M carriage way, Strom water Drains for a length of 1.975 KM at R&R Colony, Dibbapalem village, Atchutapuram Mandal, Anakapalli District.
Providing 70 Nos of 1x90W LED Street Lights on 7.5 Mtrs long octagonal poles and 8 Nos of 90WLED street lights on PSCC poles at Apparel Export Park and Block-A and fixing of 170Nos of 90W LED Street lights on existing Street light poles in all blocks of Autonagar, Visakhapatnam District under APIIC-IALA Funds.
Collection of Food waste Garbage and disposal from the units including road sides and providing Man Women mazdoor for cleaning and sweeping in entire De Notified area of APSEZ roads For the year 2025 26 under IALA funds
Laying of CC Roads, Drainage in the proposed for R&R colony in Sy. No.156P, 158P, 149, 150P of Haripuram village, Rambilli Mandal, Anakapalli District
Construction of RCC Storm water drains at UDL Kantakapally (V), Kothavalasa (M), Vizianagaram District under IALA funds.
Laying of left out CC Road and construction of SW Drains at IP MSE CDP Gandrajupalli, Gandrajupalli (V), Gangavaram (M), Chittoor District
Construction of CC Road from Ch 0.00 Mts to Ch.250 mts at UDL-II Gandrajupalli, Gangavaram (M), Chittoor District under IALA for the year 2026-27 funds.
Construction of FFC at IDP Kadapa, Kadapa(M), YSR Kadapa District.
Construction of FFC at Karivena, Karivena (V), Atmakur (M), Nandyal District.
Operation & maintenance of the 95 MLD Raw water supply scheme for providing water to Pharmacity and APSEZ by pumping from yeleru canal at Parawada, Anakapalli district for a period of two years.(2025-27)
Providing 92 Nos. 1x90W LED Street Lights on 9 Mtrs long octagonal poles along the proposed roads at the Industrial Park, Gajulamandyam, Renigunta(M), Tirupati District under APIIC-IALA works.
Providing 4.00 Mt Wide Bt Road along with earthen drains for the proposed MSME Park at Edulamustoor(V), Bathalapalli(M), Sri Satya Sai District.
Repairs and Maintenance of Administrative Building at Growth Centre, Gundlapalli, Maddipadu Mandal, Prakasam District with IALA Funds 2025-26.(2nd Call)
Engaging the Agency for Third Party Quality Control Assurance for Engineering works in Andhra Pradesh Industrial Infrastructure Corporation Limited (4th Call).
Urgent repairs to internal road at Industrial Park Madanapalem, Satyavedu Mandal, Tirupati district under IALA for the year 2026-27
Construction of Flatted Factory Complex at Industrial Park, Chavalipadu, Chavalipadu(V), Mandavalli(M), Eluru District, Andhra Pradesh under MSME..
Providing 4.00 Mt wide BT Road along with earthen drains for the proposed MSME Park at Allinagaram(V), Komarole(M), Markapauram District.
Construction of Flatted Factory Complex at Gunadala(V), Vijayawada East(M) of Vijayawada East AC, NTR District (near polytechnic college) under new MSME Scheme Phase-III.
Providing 4.00m wide BT Road along with earthen drains for the proposed MSME Park at Yallur, Yallur(V), Gosapadu(M), Nandyal District
Providing 4.00 Mt wide BT, Road along with earthern drain proposed MSME Park at Yeneti Kothuru(V), Jalumuru (M), Srikakulam Dist, Andhra Pradesh under MSME Scheme (2nd Call).
Providing 4.00 Mt wide BT, Road along with earthern drain proposed MSME Park at Cheepurlapadu(V), Kotabommali(M), Srikakulam Dist, Andhra Pradesh under MSME Scheme (2nd Call).
Jungle Clearance & Trees cutting for an extent of Ac.750.00cts in NTPC Green Hydrogen Plant Pudi, Rambilli Mandal, Anakapalli District.
Manufacture and Supply of 9.1M/280 Kg PSCC Poles to Ananthapuramu Circle
Laying of CC Road at 12th Road 1st Cross Road Junction to 14th Road at Santhinagar 2nd Road at 21st Division.
Darsi Municipality - General Fund - 2026 - 27 - Laying of CC Road from Anjaneyaswami Temple to bathula Prasad House in 14th Ward
Procurement of Gland steam Condenser Vapour Extraction Fan.
Construction of CC Drain from Bura apparao house (D.no.183) to karagana santhosh house (D.no.235) at Singarapu Veedhi in Ward No.13 of Bobbili Municipality
Construction of balance CC Drain from D.No.6-4-25/1 to D.No.6-11-6 in Kotipallivari Street Ward No.10 (Under 15th FC Grant)
Puttur Municipality - 15 FCG 2020-21 2ndinstalment - Tide - Revised ADP - Supply & Delivery of Compartmentalized four wheeler vehicles for collecting Wet & Dry Waste separately from Households at extension areas in Puttur Municipality.
Laying of CC Drain & Culvert from Plot No. 135 to EP No. 279 A/1/4 near AIIMS College, Yendada in Ward No. 08 of Madhurawada Zone.
AME for the Hi-masts available in DyEE (Elec.)-III sub-division, Tirupati for the year 2026-27
License hold rights for Sale of Pooja Articles and Fancy Items opposite to Kalyanakatta size 10x10 Vacant Site for the period from 05.09.2026 to 04.09.2027.
Construction of Flatted Factory Complex at Bandivarigudem, Bandivarigudem (V), T.narasapuram(M), Eluru District, Andhra Pradesh under MSME.
Construction of Flatted Factory Complex Building at Narisipuram, Narisipuram (V), Parvathipuram(M), Parvathipuram Manyam District under new MSME Scheme.
Construction Of Flatted Factory Complex including Electrification and Fire Fighting System at IP - Balabhadrapuram (V) Biccavolu (M) & Anaparthy Constituency, East Godavari District.
Construction Of Flatted Factory Complex including Electrification and Fire Fighting System at IP - Devarapalli(V) Ravulapalem(M) & Kothapeta Constituency, Dr. B. R. Ambedkar Konaseema District.
Construction of Flatted Factory Complex at Industrial park including Electrification and fire fighting system at Vijayawada West, NTR District, Andhrapradesh under MSME Park, Phase-III.
Safe Keeping Counters for Luggage bags and Cell Phones in the temple premises
Laying of CC Road from D.No. 15-1-6 to D.no: 15-1-4 in 10th ward of Rayadurg Municipality under Soft Loan
Request for Proposal for Empanelment of Registered Valuers for Land Valuation Assignments under Bharat Audyogik Vikas Yojana (BHAVYA) Scheme
Providing CCTV cameras at main junction and entry points in Model Industrial Park, Mallavalli(V), Bapulapadu (M), Krishna District under IALA funds.
License hold rights for Sale of Pooja Articles and Fancy Items opposite to Kalyanakatta size 10x10 Vacant Site for the period from 05.09.2026 to 04.09.2027.
Construction of FFC at Auto Nagar Molakaladinne, Molakaladinne(V), Madanapalli (M), Annamayya District.
Construction of FFC at Mangalam Village, Tirupati Urban Mandal, Tirupati District.