Loading…
Loading…
3 results • Latest
CONSTRUCTION OF BALLASTICS TEST FIRE ROOM AT THULLURU OF GUNTUR DISTRICT. SUB WORK:- PROVIDING TEXTURE PAINT FOR COMPOUND WALL & SECURITY ROOM, PROVIDING UPVC WINDOWS, UPVC DOORS, IRON PAINT FOR MS ANGLES & EXTERNAL ELECTRICAL ARRANGEMENTS OF COMPOUND WALL, SECURITY ROOM & MOTOR, PIPE LINE FROM SUMP TO BALLISTIC BUILDING
Providing and applying gold line exterior texture of average 2 to 3 mm thick over plastered surface, even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipeoff loose dust, applying textue paint filler by putty knife / muslin pad, air dry for 2-3 hours for the suface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work for external walls of all floors.
PROVIIDNG CHAIN LINK FENCING TO DMRTTI COMPOUND, REPAIRS & RENOVATIONS TO PTO STORE, INSTALLING GI PARKING SHED AT DRIVING SIMULATOR ROOM AT 6TH BN MANGALAGIRI OF GUNTUR DISTRICT.
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, ETC. COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
REPAIRS AND RENOVATION OF PHISIOTHERAPY ROOM AT APSP HEAD QUARTERS, 6TH BN, MANGALAGIRI OF GUNTUR DISTRICT.
CEMENT CONCRETE (1:5:10) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES BUT EXCLUDING SEIGNIORAGE CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATION BED AND UNDER STONE SLAB FLOORING. (APSS NO: 402).