Loading…
Loading…
1,172 results • Latest
SUPPLY OF NEOPRENE RUBBER GASKET SHEETS AND CORDS
SUPPLY OF GENERAL PURPOSE AND SS WELDING ELECTRODES
Procurement of LED Display, Physical education events audio system, Pariksha Bhavan Audio Control system,Speaker Tracking Camera for SKU University ANANTAPUR.
Providing of 1 No hired diesel driven Jeep /Bolero/Sumo at Sattupalli, Yellandu and any other mines of SCCL for conveyance of EE/FM, CC/Coal mines and deputed staff for witnessing coal sample collection and its preparation at loading end of mines by any 3rd party for the period from APRIL 2026 to MARCH 2027
Break-down works repair works and Overhauling of FD Fans and ID Fans including their lube oil systems of Unit-1 Boiler during overhaul period 2026-27
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-1 Boiler including T&P and consumables during overhaul period 2026-27
SUPPLY OF MS BENDS AND PIPES LINED WITH CAST BASALT FOR ASH SLURRY DISPOSAL LINES OF ASH HANDLING SYSTEM
SUPPLY OF SEAL KITS FOR PA,FD AND ID FANS HYDRAULIC ADJUSTMENT DEVICE(HAD) OF UNIT-3 OF SDSTPS
Procurement of teeth for 8 tooth sprocket wheels for scraper conveyors of unit-3 and 4.
PROCUREMENT OF BOLTS, NUTS, STUDS FOR CWPH and BCWPH
Providing Art Painting to Walls of Building at various locations in 01 to 38 wards in view of Swacha Survekshan 2025 in Kurnool Municipal Corporation.
Procurement of Spares for Clinker Grinders of Unit 3 and 4.
PROCUREMENT OF SPARES FOR M/C TRCM AT CWPH.
PROCUREMENT OF BAR CONNECTORS FOR SCRAPER CONVEYORS OF UNIT-3 AND 4.
PROCUREMENT OF SPARES FOR SCREEN WASH PUMPS
Construction of RCC strom water drain at RTC workshop road from Raja Manikyam Enclave to upto EP 40/124/4 in Division 40 Circle-I area. (1st call).
Comprehensive Annual Maintenance to the CCTV system in the premises of Lok Bhavan at Governorpet, Vijayawada for the year 2026-27
Providing DWF through 100 percentage FHTCs to Gadyaguda H o Sagara GP in Dumbriguda mandal of Alluri Sitharamaraju District of Est cost Rs 14.60 Lakhs
Maintenance of lawns/plants at the premises of Training Institute complex for the year 2026-27 i.e., from 01.04.2026 or from the actual Date of Commencement of work to 31.03.2027.
Carrying out day-to-day and periodical maintenance activities of IP based wired CCTV network system and Industrial Public addressing system installed at stage-2 of SDSTPS for the year 2026-27
SDSTPS - 3 X 800 MW - Providing new BT layer at damaged locations of Ash road from Main gate to Ash gate upto 100m length.
SUPPLY OF STP PRIMARY CLARIFIER SLUDGE TRANSFER PUMP WITH MOTOR(VERTICAL SCREW PUMP WITH MOTOR)PUMP MODEL NO.EU-236 AND STP SECONDARY CLARIFIER SLUDGE TRANSFER PUMP WITH MOTOR (VERTICLE SCREW PUMP WITH MOTOR PUMP MODEL NO. EU-164 FOR CAM/SD3 STAGE-I
LICENSE RIGHT FOR COLLECTION OF HUMAN HAIR AT KESAKHANDANA SALA
Construction of Community Sanitary Complexes at Aswardha Narayana Swmy temple at Chinnapappur village of Peddapapur mandal
Carrying out Operation and Maintenance including watch and ward, housekeeping and gardening, MRT Assistance and assistance for Telecom of EHT Sub-stations and lines and CBD and SM Gangs for lines and sub-stations on works Contract basis pertaining to 132KV SS Tenali, 132KV SS Tadepalli 132KV SS Ponnur and CBD Gang, Tadikonda pertaining to O and M Circle Guntur in Vijayawada Zone for the period of three years from the date of awarding of work (RESERVED FOR SC BIDDERS)
Advanced Skill Training Programme for Workforce Readiness Initiative in Precision and Aerial Technologies for Scheduled Caste Students
Providing Cross Barrier on the Road from PP Road to Lingala -Parnapalli R and B Road at Parnapalli Village and GP of Lingala Mandal in YSR Kadapa District With an Est.Cost Rs.15.00 Lakhs
Providing BT Approaches to Cross Roads at Jetti Siva House, CH Bala Narasimha Rao House, D Devasahayam House and Jaldi Yesubabu House from R&B Road in Dolas nagar sachivalayam 10th ward of Tadepalli Urban under AE-4 Section of Mangalagiri Tadepalli Municipal Corporation under General Funds
FDR 10/2025 - Temporary Restoration to Supply Channel of Chakalikonda MI Tank near Chakalikonda Village in Vinjamur Mandal of SPSR Nellore Dist.
FDR 10/2025: Temporary restoration to 2 nos of Sluices Shuttering arrangement of Nagulavaram Tank in Nagulavaram Village in Bogole Mandal of SPSR Nellore District.
Raising of CC road from Anday Sastrilu house D.No.21-6-9/1 to Navuluri siva kumar house via Pole No.SS/217/3/3 behind LG show room in ward No.10 in Chirala Municipality
Construction of CC Drains in the Village Limits of Konnamgunta of Nuzvid - Ravicherla Road from Km 3.400 to 4.600 in Eluru District (3rd call)
Providing power infrastructure by erection of 11KV/LT 3 Phase 5 Wire Line along the proposed internal roads with required Distribution Transformers and Providing 38Nos. 1x90W LED Street lights on 9 Mtrs long octagonal poles along the proposed roads at MSME Park at Sirasanambedu (V), Pellakur (M), Tirupati District.
Restoration of Quality Control Division Office Complex towards Special Emergency repairs to non-Residential office buildings in TGP Camp Colony Kothur near Nellore of SPSR Nellore DistrictRestoration of Quality Control Division Office Complex towards Special Emergency repairs to non-Residential office buildings in TGP Camp Colony Kothur near Nellore of SPSR Nellore District
Lifting of Coal powder Ash and the other reject material collected from the mill reject system of Unit-1& 2 SDSTPS and disposing the same at suitable place as and when required during the year 2026- 27
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT # 1 ESP Hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2026-27
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-1 ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2026-27
Fly Ash System-Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines of Unit-2 AB Pass ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2026-27
Dr. MVR RTPP-M12-CAM-Stage 2 -Procurement of 300NB gate valves, butterfly valves, NRVs and 200NB plug valve for bottm ash and wet ash sysytem-reg.
Dr. MVR RTPP-M12-CAM-Stage 1-Procurement of cutless rubber bearing suitable for BCW pump of model BHR54, RW pump of model BHQ27 and ACW pump of model TM24TC-reg