Strengthening of earth mat in switch yard by providing additional 100X16mm GI flat on outer periphery, 75X12mm MS flat for internal grid, 75X12mm GI flat for equipment risers and providing additional earth pits to minimize the equipment damages during faults in yard of 220/132/33KV Parawada SS under RMI 25-26
Erection of 2 No. 33kV, 7.2 MVAr Capacitor Bank Bays at 132/33kV Sub-Station, Dharmajigudem.
Erection of 1 No. 33kV 7.2MVAR Capacitor Bank at 132kV SS T.Narsapuram SS under RMI 2025-26 Scheme in O&M Circle Eluru.
Providing of 2nd 220KV BUS set at 220KVSS Sullurupeta in O&M Circle Nellore under RMI 2025-26
Rectification of damaged Stubs and Raising of Chimneys or Copings in 132kV Tadepalli Guntur SC line 132kV Guntur Parchur SC line and 132kV Tadikonda Guntur DC line at various locations under the jurisdiction of EHT lines Guntur in Guntur District under O&M works
Construction of RCC retaining wall for location No.37 of SAE type (A+0) of 220KV SS Pendurthy - Maradam DC line in Visakhapatnam Dt
Strengthening of earth mat by providing 100X16mm MS flat, 75X12mm MS flat, 40mm MS rods & additional earth pits for 220KV Tekkali-I feeder bay, 220KV bays of 160MVA PTR-I & 100MVA PTR-II, 7Nos 132KV feeder bays, 3Nos 132KV Transformer bays and 9Nos 33KV feeder bays to minimize /nullify equipment damages during fault periods and also to provide metal spreading at 220KV SS Garividi under RMI 24-25
Replacement of damaged windows and doors with UPVC windows and scientific doors, fixing mineral fiber false ceiling in the first floor of Control room and other miscellaneous works at 132/33KVSS Silkroad Sugars
Painting of MS Towers with one coat of red oxide paint and one coat of Aluminium paint in 220KV Tallapalli - N.Sagar DC line from Loc No.1 to 40 in O&M Circle, Guntur
Raising of chimneys and providing of copings in 220kV VTPS Piduguralla DC line from Loc No 41 to 149 (109Nos) under the jurisdiction of EHT lines Tadikonda in Guntur District under O&M works.
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG PIDUGURALLA ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, PIDUGURALLA IN O&M DIVISION, NARASARAOPET
Painting of MS Towers bearing Loc.No.27 to 140 (114 Towers) with single coat of 1st Grade Red Oxide paint and one coat of 1st Grade Aluminium paint in 132 KV NG Palli - Palamaneru DC Line in Chittoor (Dt), O&M Circle Tirupati
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TADIKONDA ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TADIKONDA IN O&M DIVISION, GUNTUR
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG SATTENAPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF 400 KV EHT LINES, SATTENAPALLI IN 400KV/O&M DIVISION, SATTENAPALLI
PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TADEPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TADEPALLI IN O&M DIVISION, GUNTUR
FOR PROVIDING OF 1NO. 3TON VAN FOR CONVEYANCE OF CBD GANG TALLAPALLI ON WORKS CONTRACT BASIS FOR CARRYING OUT OPERATION AND MAINTENANCE, EMERGENCY AND BREAKDOWN WORKS OF EHT LINES, TALLAPALLI IN O&M DIVISION, NARASARAOPET
Erection of 1 No. New 33KV, 7.2 MVAR Capacitor bank at 132KV SS Kalasapadu under RMI 2026-27 scheme
Erection of 1 No. New 33 KV 7.2 MVAR Capacitor bank at 132KV SS B.Mattam under RMI 2026-27 scheme
Erection of 1 no 33kv bay extension for providing 33KV dedicated feeder to APRTC Bus depot from 220KV SS Vepakayaladibba in O and M Division bommuru
Erection of 2nd 33kV, 7.2 MVAr Capacitor Bank Bay at 132/33kV Sub-Station, T. Narasapuram under RMI 2026-27 Scheme
Erection of 2nd 33kV, 7.2 MVAR Capacitor Bank Bay at 132/33kV Sub-Station, Narayanapuram under RMI 2026-27 Scheme.
Erection of 1 No. 33kV 7.2MVAR Capacitor Bank at 132kV SS Narayanapuram SS under RMI 2025-26 Scheme in O&M Circle Eluru
Strengthening of earth mat by providing additional 100X16mm MS/GI flat, 75X12mm MS/GI flat, 40mm dia MS rods & additional new earth pits to minimize/ nullify equipment damages during fault periods at 220KV Gajuwaka SS under RMI 2024-25
Erection of new 33KV 7.2MVAR Capacitor bank at 132KV SS K.P.Mitta.
Supply, erection, testing and commissioning of 2nd circuit stringing on existing 132KV DC/SC line from 220KV SS Kalikiri to 132KV SS Rompicherla(30.70km OH Transmission line) and 1No 132kv Bay erection at 220KV SS Kalikiri and 1No 132KV bay erection at 132KV SS Rompicherla
Erection of New 7.2MVAR Capacitor Bank and 6No. Air Core series reactors along with bay equipment at 132/33KV Substation Rapur in SPSR Nellore District under RMI 2023-24.
Engaging of 2 Nos Private Drivers on work contract basis for driving department vehicles pertaining to various wings in O&M Circle, VIsakhapatnam for a period of 9 Months from 01.07.2026 to 31.03.2027.
Providing false ceiling, Supply & Fixing of Scientific Doors and UPVC Windows in the Control room of 220KV SS Nandyala
Renovation of existing damaged toilet into 2Nos separate toilets for both men and women employees, construction of material stacking platform and providing of false ceiling & Aluminium partition in Battery room at 132KV SS Nallapadu, Guntur District
Construction of 2nd Floor over the existing G+1 Building of New Zonal Office to facilitate the offices functioning in the Old Zonal Office, Vidyut Soudha premises, Vijayawada (3rd Call)
Erection of total 12 nos. 132 kV LAs along with earth pits for 132 kV TBVara- vontihadi feeder, 132 kV TBVara- Garividi feeder, 132 kV TBVara- Goldstar feeder, 132 kV TBVara- Kothavalasa feeder at 132kV TB Vara SS under rmi 24 25
Augmentation of 132/33KV PTR capacity from 2x31.5MVA to 2x31.5+1x50MVA at 132/33KV SS Vinjamuru in O&M Circle, Nellore in Vijayawada Zone
Erection of 2nd 33kV, 7.2 MVAr Capacitor Bank Bay at 132/33kV Sub-Station, Dwaraka Tirumala under RMI 2026-27 Scheme.
Erection of 1 No. 33kV 7.2MVAR Capacitor Bank at 132kV SS Dwaraka Tirumala SS under RMI 2025-26 Scheme in O&M Circle Eluru
Supply, Erection and Commissioning of 06 Nos 33 KV feeder bays in O and M Ananthapur Circle for bifurcaion of 33 KV overloaded feeders in APSPDCL at various existing 132/33 KV and 220/132/33 KV sub-stations in Kadapa zone on semi turn key basis
Supply, erection, testing & commisioning of 2nd set of 7.2MVAR capacitor bank at 220kV SS Piduguralla under RMI scheme-2023-24
Augmentation of PTR capacity from existing 3X100MVA to 2X100+1X160MVA at 220KV SS Kalikiri in O and M Circle Tirupati
Providing and Fixing of Step bolts and phase plates at various locations in between 99 to 239 in 220KV VTPS -Rentachintala Circuit 1 & 2 DC Line under the jurisdiction of EHT Lines Piduguralla in Palnadu Dt.
Providing of 1No GPS equipment for time synchronization along with necessary accessories under RMI scheme 2024-2025 at 220KV SS APCarbides Kurnool
i)Replacement of Blade type Bus Isolators of 33KV Chirala, 33KV Parchur feeders and 31.5MVA PTR-l LV with Pipe type isolators. ii)Replacement and realignment of Blade type hanging type 33KV Line isolators of 33KV Chirala D-2 and 33KV Parchur feeders. iii)Realignment of hanging type Line Isolators of 33KV Vetapalem and 33KV Uppugunduru feeders. iv)Replacement of old 33KV CTs of 33KV Parchur Feeder (Y-phase) and 33KV ILTD Feeders at 132/33KV SS Chirala under RMI scheme 2024-25
Replacement of existing ACSR Lynx Panther conductor with ACSS RW Lynx conductor on 132KV Brandix Narsingabilli DC SC line on turnkey basis in OnM Circle Visakhapatnam
Reconductoring of existing ACSR zebra conductor with ACSS RW zebra equivalent conductor in 220KV Gajuwaka Gangavaram 8KM line on turnkey basis in OnM Circle Visakhapatnam
painting of MS tower parts of PRS towers of 132KV kalyandurg-Rayadurg DC/DC line from Loc.No.21-59(39 locations) with one coat red oxide and one coat aluminium paint under O nM scheme
Providing of 132KV Bus PTs Set-2 at 132/33kV Substation, Tenali including Civil under RMI 2023-24 scheme works.
RENOVATION AND STANDARDIZATION OF EARTH MAT AND EARTHING OF BAY EQUIPMENT PERTAINING TO 33KV FEEDERS AND 33KV PTR BAY EQUIPMENT PERTAINING TO 33KV FEEDERS AND 33KV PTRS BAY EQUIPMENT AT 132/33KV SS BAPATLA UNDER RMI 24-25
ERECTION TESTING AND COMMISSIONING OF 2ND SET OF 7.2MVAR CAPACITOR BANK AT 132/33KV SS MACHERLA UNDER RMI 2024-2025
Supply, erection, testing & commisioning of of 7.2MVAR capacitor bank at 132kV SS Veldurthy under RMI scheme-2024-25
Providing of water pipe line to earth pits, Renovation of control room by providing False ceiling, Scientific doors, UPVC windows and miscellaneous Civil works at 132KV SS Macherla in Palnadu District.
a)Replacement of existing old and obsolete Vacuum Circuit Breakers of 33KV Parchur, 33KV Adusumalli, 33KV Yaddanapudi Feeders and 132/33KV, 10/16MVA PTR-II LV. b) Replacement of 132/33KV,10/16MVA PTR-II LV Bus Isolator and c) Realignment of hanging type Line isolators of 33KV Parchur, 33KV Adusumalli & 33KV Yaddanapudi feeders at 220/132/33KV SS Parchur under RMI scheme 2024-25