Loading…
Loading…
247 results • Recent activity
Erection and dismantling of HT(3.3KV) overhead line at Potanga quarry on as and when required basis for a period of one year (365 days) under Urimari OCP.
Laying, erection, dismantling and repairing of 150mm and 200mm dia M/S GI pipeline as when as on required basis at Bhurkunda Project.
Repairing of Kirloskar Make UP200/56 Model, 540 Cu.M/Hr (2000 GPM) Pump, 100 Mtr. Head, Pump Sl. No. 02 along with rep of motor 350KW, 3.3KV of Sayal OCP.
Supply and fixing of change over switch 100Amp/415V/ 50Hz (four pole) (02Nos), 200Amp/415V/50Hz, (four pole) (02 Nos) for different location and fabrication of 01 No Shade with chemical earth pit for DG Set at Rest house Bhurkunda Proj
Repairing of 20 Nos. defunct MCCB to make it operative in different LT feeder under Bhurkunda Colliery.
Providing and fixing of 11KV and 3.3KV Grade station type lighting arrestor of main 11KV/3.3KV sub station under Bhurkunda Colliery.