Loading…
Loading…
249 results • Recent activity
Comprehensive annual maintenance contract of 02 no. Of 50 MT capacity electronic road weighbridge installed at Mine A and Mine B under Bhurkunda Project.
Repairing or reconditioning of DSM2, DSM3 and DSM4 pump for different workers colony water supply at different colonies under Bhurkunda Project (B-S Area).
Repairing or reconditioning of 02 Nos of 75 KW motor , connecting base along with different valve with installation work under Bhurkunda Project (B-S Area).
Providing and fixing of neutral resistor monitor relay, CT indicator lamp and current monitor relay and other items of 02 nos. 3.3KV grade NGR is installed at main 11KV/3.3KV main substation BHK and Balkudra 11KV/3.3KV substation under Bhurkunda Col.
Repairing and Rewinding of 350KW, 3.3KV, 1491RPM, Sl. No. 211432-2 induction motor was running under Bhurkunda Colliery.
Installation and commissioning of 02 nos. surge protection device and complete rewiring of 02 nos. weighbridge rooms and 01 no. rest shed with toilet under Bhurkunda Colliery.