Loading…
Loading…
247 results • Recent activity
Repair of sprocket assy eye hole cutting and welding of sprocket guard, blade arm, AC element housing with repairing of Engine Transmission guard, both side trunnion and replacement of cutting edges and end bits and UJ Assly of 13586 Dozer of Birsa
Part Repairing of Kirloskar make 110KW,440V,1482 RPM, Motor, SI No. 29712118-1 installed at Patratu Water works under Sayal-D Project.
Tent Arrangement and Allied Activities complete in all respect as per instructions of Engineer In Charge for the Celebration of the Prize distribution cum-Final Day Function of Annual Mines Safety Week 2025 to be held at BS Area under GM Unit
Repairing and Maintenance of HT and LT Overhead Lines on as and when required basis for a period of one year (365 Days) of Balkudra OC under Bhurkunda Project of Barka Sayal Area.
Repair and maintenance of approach road to Mayur stadium under Bhurkunda Project, Barkasayal Area.
Rearrangement of 3.3 KV overhead circuit for shifting the existing switch room to the newly commissioned 2 X 5 MVA 33KV/6.6 KV substation under Birsa Project