Loading…
Loading…
584 results • Recent activity
Electrical repairing and maintenance of LT 440V overhead line by dismantling of damaged Poles and Conductor and Erection of New Poles and Conductor along with providing and fitting of other electrical parts at Harina Basti under Harina Township, Bloc
Dismantling of 03 Nos of 33KV MOCB and installation of 03 Nos of New 33KV,1250A VCB (Sl. No.116472P, 116473P,116476P) for washery-1 feeder, 20mva-1 and 20mva-2 transformer in place of the same at Madhuban DG Substation under Block II Area
Providing proper illuminating inside and outside weighbridge premises of Block-II Area
Installation of Camera New Madhuban Coal Washery No. 2 and No.4 under Block-II Area
Dismantling/Repairing and refitting of 400 watt/200 watt and 100 watt LED flood light set at different location Kessurgarh siding Nadkhurkee Weigh bridge and AMPL Weighbridge area under ABOCP Mine Block-II Area
6.6KV. Benidibh Feeder erection. diversion and clear the area in Deco Box Cut-IIIL. Deco East face, Middle face for power supply to 4000 GPM pump motor etc. ABOCP mine under Block-Area