Loading…
Loading…
582 results • Recent activity
A) Dismantling Erection Diversion of 6.6 KV Benidih feeder clear the OB Dumping Area power supply shovel M/C drill M/C and Installation of 10KVA/6.6KV/220V Transformer lighting for haul road ABOCP Mine. (B) Dismantling Erection, breakdown repairing o
A) Dismantling, Erection, of 6.6 KV Benidih feeder power supply 4000 GPM pump drag line machine and (B) dismantling Installation of 6.6 KV/440V Transformer of ABOCP face (c) Dismantling, Erection of 440V/220V LT O/H line Beiyardih Basti Kessurgarh, h
Leakage repair in 10/8/6 inch dia pipeline from Bhimkanali sump to 45 No pump and overhead tank bhimkanali township and other miscellaneous work under JWTP Block Area.
Work of leakage repair in 16 inch dia pipeline form Harina Boosting to jagdish petrol pump jamua tand to barora matha bandh and 6/8 inches dia pipeline from harina boosting to harina colony in various location and other Miscellaneous Work under JWTP
Repairing miscellaneous work related to shifting of pump motor set 2000GPM(MnP)/3200GPM with diversion and extension of delivery range 10in/8in dia MS pipe as per new position at Deco main Sump (drag line coal face) of ABOCP mine under Block-II Area
Assembling, Transporting and Installation of a 4000 GPM Pump motor set from RRWS to Deco coal face ABOCP and erection its pipe line at Second delivery range outer side ABOCP mine under Block-II, Area