Loading…
Loading…
582 results • Recent activity
Repairing and rotating of 70.00 m length and 0.60 m dia damaged overflow pipe of overhead tank of Jig at Madhuban Coal Washery under Block-II Area, BCCL.Washery under Block-II Area, BCCL
Dismantling and erection of two feeders of 6.6 KV i.e. lagoon feeder and RRWS feeder damaged by dumper dala JH10CV3394 at Madhuban NLW Coal Washery under Block-II Area, BCCL.
Repairing of 05 nos. of Reciprocating feeder, chute and side skirt in Loading section at Madhuban Coal Washery under Block-II Area, BCCL
Repairing 04 nos. of Reciprocating feeder, chute and side skirt in Loading section 1402 unit at Madhuban Coal Washery under Block-II Area, BCCL
Upkeepment of spilled materials wash coal from bottom floor area of PS-9 main washery Building at Madhuban Coal Washery under Block-II Area, BCCL
Upkeepemnt, removal of bolder from the mouth of Gyratory crusher in ROM section at Madhuban Coal Washery under Block-II Area, BCCL