Loading…
Loading…
368 results • Recent activity
The erection of 220V Overhead line from Dhansar OCP to provide power point to run telemetry device for water level monitoring near mine rescue station, Dhansar, Kusunda Area
Partial repairing of 11 kV, 400A, Biccolauric make, OCB which is primary controlling of 11kV/3.3kV,1500kV transformer-1 installed at RK camp at S/S of Ena Colliery.
Repairing of 1 No. of voltage transformer of 11 kV, 400A OCB with Sl. P.B 4-9052 at Ena S/S of Ena Colliery
Installation of franklin rod conductor-2 Nos. and Earth pit -3 Nos. at Ena weighbridge and Ena view point for thundering protection of the crowded areas as per safety guideline at Ena Colliery, kusunda Area.
Installation of 1 Nos. of 11KV/440V, 450 KVA Transformer and associated works in HT side and LT side at Ena Substation under Ena Colliery
Maintenanceand overhauling of 5KVA and 30KVA Generators which is installed at Matkuria Club and Kusunda Area office under , Kusunda Area.