Loading…
Loading…
272 results • Recent activity
Towards diversion of O/H lines 220V domestic power supplied from 5 pit substn to Mazar Colony Loyabad(ii)dismantling 440V O/H line and installation of 220V O/H line with fitting LED lights BOCP(iii)Erection of 440V O/H Line for giving power to mobile
For replacement of complete 550V O/H from ekra substation to jore pump and replacement of old damaged pole BSP(ii)dismantling and erection 440V O/H line at ASBNC(iii)division and erection of lighting line 220V O/H BOCP(iv)repairing and maintenance o
Repairing of HT Switch, 400Amps.Sl.No.5732 Make GEC (ii) 3.3KV,400Amps Sl.No.190 Switch Make Prabhu,7/8 Substation TMC
For Installation of Chemical Earth Pit (08)at different places Electrical Substation KNC(B)Fabrication and installation of 02 nos. of interlocking setup between AB Switch and controlling VCB Switch Gear at SBC/ASBNC(Central Pool and CHP).
(A). For the repairing and overhauling of VCB 400 A 6.6 KV Make Prabhu at Kankanee Colliery. (B). For Repairing of TSU, make Electroteknica, Sl. No.- 10/40 at TOCP Sub-Station, Tetulmari Colliery. (C ). For complete repairing/over hauling of 6.6 KV 4
Rep. of auto greasing system assembly, rotary head motor due to main shaft and bearing worn out of RECP Drill Sl. No. 6020817 at Bansdeopur OCP, Sijua Area.