Loading…
Loading…
27 results • Latest
Construction of Elevated Corridor (Flyover) at Adyar Ananda Bhavan Raghuvanahalli cross, Kanakapura Road in Bengaluru City (Length 0.90 kms) using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation based structures including Maintenance for a period of 10 years.
Estimate for obtaining the services from consultants to Prepare Detailed Project Report for the Comprehensive Development of Footpath & White Topping of selected Roads in Bangalore North City Corporation (Zone-2) Limits.
Construction of Split Flyover at MEI Junction on Tumkur road in front of RNS Shantinikethan (Length-0.50KM) under Engineering, Procurement and Construction (EPC) Mode on Lumpsum, Turnkey with allowable Price Escalation including 10 years of maintenance
Project management consultancy (pmc) consultancy services to the works taken up under sancharyukta scheme by b-smile in bengaluru city limits for the works 1. Protection improvement of rajakaluve/buffer zone including formation of service road from bellandur waste weir/ outlet to old airport road virginia mall in bengaluru east city corporation limits 2. Protection improvement of rajakaluve/buffer zone including formation of service road utilizing property at wind tunnel road in bengaluru east city corporation limits
Project management consultancy (PMC) and proof checking consultancy services for the work of Construction of Elevated Rotary Flyover at IOC Junction and Construction of additional 2 Lane ROB at Baiyyappanahalli Railway Level Crossing on Lumpsum, Turnkey with allowable Price Escalation basis
Providing office and Support Staff for Bengaluru Smart Infrastructure Limited
Project Management Consultancy PMC Consultancy services to the works taken up under Sancharyukta scheme by BSMILE in Bengaluru City Limits for the works 1. Protection Improvement of Rajakaluve/Buffer Zone including formation of service road from Bellandur Waste weir/ Outlet to Old Airport road Virginia Mall in Bengaluru East City Corporation limits2. Protection Improvement of Rajakaluve/Buffer Zone including formation of service road utilizing property at Wind Tunnel road in Bengaluru East City Corpration limits
Construction of Elevated Corridor from Doddaballapura Road (Police Station Junction) to NH-7 (Navayuga Flyover) at Kogilu Circle via Old Yelahanka Town under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation including maintenance for a period 10 years
Estimate for obtaining the services from consultants to Prepare Detailed Project Report for the Comprehensive Development of Footpath & White Topping of selected Roads in Bangalore North City Corporation (Zone-1) Limits.
Construction of Elevated Corridors from Minerva Circle to Hudson Circle and loop flyover from existing Bala Gangadhara Nath Swamiji Flyover to Town Hall, and Elevated Corridors from Sangolli Rayanna Circle (Anandrao Flyover) to Nrupathunga Road (KR Circle) in Bengaluru City (Length - 7 KM) under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) - based structures including maintenance for a period 10 years
Consultancy services for Strategic Advisory to B-SMILE and GBA for execution of priority initiatives
Estimate for obtaining the services from consultants to Prepare Detailed Project Report for the Comprehensive Development of Footpath & White Topping of selected Roads in Bangalore South City Corporation (Zone-1) Limits.
Identification, feasibility study and Survey of Rajakaluve and Lake buffer including Reconnaissance Survey, Preparation of Land Acquisition Proposal, Topographical survey, Marking of ROW, Drawings, Land Plan Survey, Boundary Pillar, Geometric Design, Strip Plan, Junction Design, Longitudinal Section and Cross Section etc.(Approximately 425 km) pertaining to protection, Improvement of Rajakaluve and Lake Buffer area including service road in Bangalore city
Estimate for obtaining the services from consultants to Prepare Detailed Project Report for the Comprehensive Development of Footpath & White Topping of selected Roads in Bangalore West City Corporation (Zone-2) Limits.
Estimate for the work of Providing Green Eco Barrier as Central/Side Median made out of Reinforced Cement Concrete at Raitha santhe road (Jakkur Road) including Green hedging and maintenance for a period of 2 years in Bengaluru North City Corporation Limits.
Consultancy Service for Topographical survey, Cadastral survey, Preparation of Land Acquisition plan and preparation of Form 1, Form-3 Notification & assisting department for completing TDR process of 1.200 Km for the work of Widening and Improvements to Ittamadu Main Road from Janatha Bazar on Outer Ring Road to SWD near VBB Bakery on Ittamadu Main Road
Comprehensive development of Outer Ring Road from Silk Board Junction to K.R. Puram Metro Station to Global standards Package 2 Iblur Junction to KR Puram Metro Station (Length 11.57km)
Comprehensive development of Outer Ring Road from Silk Board Junction to K.R. Puram Metro Station to Global standards Package 1 Silk Board Junction to Iblur Junction Length 5.44km
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), A3 Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Construction of Elevated Corridor from Sirsi Circle to Nayandahalli on Mysuru Road (Length - 5.20 KM) in Bengaluru City under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) - based structures including maintenance for a period 10 years
Construction of Grade Separators at Pipeline road from West of Chord Road to Outer Ring Road in Mahalakshmi Layout (Length-2Km) under Engineering, Procurement Construction (EPC) Mode on Lumpsum,Turnkey with allowable Price Escalation using Ultra High-Performance Fiber Reinforced Concrete(UHPFRC) based structures including 10 years of maintenance
Construction of Elevated Corridor (Flyover) at Konanakunte Cross on Kanakapura road in Bengaluru City (Length 1.50 kms) using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation based structures including Maintenance for a period of 10 years.
Construction of Elevated corridor from Old Madras Road to Electronic City flyover via Swami Vivekananda Metro Station - Indiranagar - Old Airport road - Hosur road - Silk Board Junction (Length 5.20 kms) in Bengaluru city under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) based structures including maintenance for a period of 10 years
Construction of Elevated Corridors from Sholay Circle to St. John Hospital Road on Hosur Road via Anepalya Junction and Adugodi Junction under Engineering, Procurement & Construction (EPC) Mode on Lumpsum, Turkey with allowable Price Escalation using Ultra High-Performance Fiber Reinforced Concrete (UHPFRC) - based structures including maintenance for a period 10 years
Project Management Consultancy (PMC) Consultancy services to the works taken up under Sancharyukta scheme by B-SMILE in Bengaluru West City Limits for the works 1. Protection, Improvement of Rajakaluve / Buffer Zone including formation of Kerekodi road from V-Legacy road to RR Nagara Arch 2. Protection, Improvement of Rajakaluve / Buffer Zone including formation of service road Nayandahalli circle to V-Legacy road
Providing office and Support Staff for Bengaluru Smart Infrastructure Limited
Project Management Consultancy (PMC) Consultancy services to the works taken up under Sancharyukta scheme by B-SMILE in Bengaluru North City Limits for the works 1. Protection, Improvement of Rajakaluve / Buffer Zone including formation of service road from Hebbala Military Area (Sarovara Layout) to Thanisandra Main Road, 2. Protection, Improvement of Rajakaluve / Buffer Zone including formation of service road from Thanisandra Main Road to Hennur Main Road