Loading…
Loading…
3 results • Latest
Jungle clearance and cleaning of out fall drain from l.r.c to v-notch, V-Notch culvert to 260 m. and work shop to nursury right Earthen Dam
Clearing jungle including uprooting of rank getation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a eight of 1 mabove ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Construction of chute drain and Repair Cross Drain RD 760 M to 2290 M Left flank of Earth Dam Rajghat
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
Providing of New V- Notch and Relaying stone Pitching at RD 1.900 KM at D/s of Left flank Rajghat dam
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil