Loading…
Loading…
234 live119 closing this weekmost from Bharat Coking Coal Limited and Coal India Limited
234 results • Latest
Distempering and painting of hanuman mandir at Sinidih under Govindpur Area
Shifting of pre cast boundary wall from coal dump no 13A and 13 B at NAKC to coal dump no 29B,30B and 30A at ABGC under Govindpur area
Repair of drain at 450 to 460 and 616 to 619 Mathadih under Govindpur Area
Renovation of Transformer shed near 3 seam old bore hole jogidih under Govindpur Area
Painting and distempering at kali Mandir Bilbera UNDER govindpur area
Work of Installation of tiles at kali Mandir at Tundu under Govindpur area
Repair and maintenance of Shiv Mandir and Hanuman Mandir at Tilatand colony under Govindpur Area
Construction of Garland drain with siltation pond , catch drain and retaining wall from OB dump Tetulmari to Punjabi more along nagri jore under Tetulmari Colliery under Sijua Area
LED Luminaire For Floodlight Conforming To IS10322 (Part5/Section5) (V3) (Under BISScheme-II) (Q2)
Complete Repairing of PV II 4 Satge Pump at Filter Plant Bera Colliery.
Electrical wiring of Quarter of Smt Malti Devi of Bastacolla Area
Making of Two (02) no Barriers in Siding to Prevent Damage from Hywa Movement to Over Head line and CHP at BNR Siding under Bastacolla Area.
Under Ground Wiring (Modular) Sri Rohit Saini Area Manager (Env) Bastacolla Area Quarter No- 77 Block No 08 New C Type Koyla Nagar Bastacolla Area.
Repairing of 550 volt Neutral Grounding Resistance System of 0 Seam Kuya Colliery
Preventive Maintenance of 11 KV Overload Line of Kuya Feeder Under Golakdih Sub Station Under Bastacolla Area
Complete Repairing rewinding and Overhauling of 7.5 HP, 440 Volts, 2900 RPM Submersible Motor and 15 Stage Submersible Pump at CISF Camp Bera Magazine Room for Drinking Water Under Bastacolla Area.
Complete Repairing of 400 Amp 11KV/OCB with Busbar Biecco Lowrie make Sl. No PB4-13086 of main Switch of Victory Sub Station at Bastacolla Colliery.
Quarterly Testing Required for the 01 No new 100 Tonne Weighbridge i.e. Bastacolla OCP with 25 Tonne under Bastacolla Area and Shifting of 02 times 15 Tonne Test Weights from One Weighbridge to Another Weighbridge Under Bastacolla Area.
Electrical Wiring of Quarter No- EBC/B-5 Ravi Bhunya DG Operator P No- 61489764 at Under Bastacolla Area
Lifting and Lowering of 7.5 HP/440Volt Submersible Pump at Tisra Regional Hospital under Bastacolla Area.
Loading of MS Pipe 10 Inch 126 No from Ekra Central Store and Unloading at KOCP 14 No Parking under ABDKC
Repairing of DG Sets at Bastacolla Area office and Area Guest House.
Repairing of Plates and testing of Rajapur and Kuya OCP 60 Tonne Weighbridge.
Ceilling Fan Rewinding and Cable Jointing at Different Loacation of Area office
Dismantle of 02 No Tippler Bunker 6/12 Guarder, 5/10 Guarder 8mm Plate 6mm Plate 2/1/2/5 Channel And 4/2 Channel Loading from Bera Colliery to Unloading Victory 1 Pit Bastacolla Colliery.
Repairing of PV II 6 Stage Pump of Bera Colliery Under ABDKGC
Repairing / Changing of Damaged MS Pipe 6 Inch from 0 Seam to Check Point Near Mada Plant ABDKC
Lifting and Lowering of 120HP 600 GPM Pump Motor Set from Bore Hole No.- 1 Near Sahana Pahari Substation under Dobari Colliery ABDKC
Annual Testing Required for the Stamping of 02 No 60 Tonne Weighbridge i.e. Kuya 60 Tonne WB and BNR Railway Siding Under Bastacolla Area and Shifting of 02 Times test Weights i.e. from Different weighbridge to Different weighbridge respectively unde
Driving Shaft Top Portion Support System New Making and Manufacturing Supply of Rock Breaker Chain Pin for Atlas Copco Feeder Breaker at BNR Siding ROCP/SJ.
Complete Repairing of Conveyor Belt Gear box Assy of Atlas Copco Make Feeder Breaker at BNR Siding ROCP/SJ.
Dismantling, transportation, re-fitting/assembling and recommissioning of BE-1000 Hydraulic Shovel SI. No.G-10232(B/H), BCCL No. S-453 from Bastacolla Area to CV Area.
Repairing/Overhauling of Clutch Plate, Gear Box, King Pin leaf spring assembly of Hyva Tipper JH10AD 7093 of 5.0 MTPA Patherdih NLW Coal Washery.
A) Repairing through OEM (propeirtary basis) of flowmeter installed at DBOCP and DOCP of CV Area, BCCL. B) Conversion of existing flow meter telemetry communication from 2G sim network to 4G sim network for data uploading to cloud platform.
Repairing and retentioning of 6.6 K.V N.O.C.P washer feeder for smoothly power to domestic power and AMPL and Feeder breaker and K.K.C main siding etc. At BOCP Mine under Block -II Area.
Work Complete Repairing and rewinding of 160KW Motor, make Kirloskar 440V, 3 phase induction motor Sl. No. EnM/FB/Nadkhurkee/02 at ABOCP Mine under Block-II Area.
Dismantling of ACSR Rabbit and ACSR Dog Conductors of Overhead Line at different locations at ABOCP Mine under Block-II Area.
Supply and fitting of 50W Street LED lights at Sec-I to Sec-IV in Phase-1 under Matigarh Township of Block II Area.
Execution of 5.0 Ha Plantation (Densification,Rejuvenation of old site) at Benidih OB Dump, ABOCP Mine and Upkeeping of Garden including garden lighting and other allied electrical works at NNTS, Harina Colony under Block-II Area.
Repairing of house wiring of M2-115,M1-B15,M6-36,M4-88 Under Matigarh Township of Block-II Area.
Rubber lagging of 02 nos conveyor drum of Kesssurgarh Feeder breaker No-2 at ABOCP Mine Under, Block-II Area.
Water Proofing Of Building
Repairing of house wiring of Partial M4-89, M5-190, M4-48, M1-9, M6-55 at Matigarh Township of Block-II Area.
Supply and fitting of 50W Street LED lights at D type street, C type (new and old) subhash Bhawan and Ravindra sadan in Phase 1 under Harina Township of Block II Area.
Painting and labelling of electric pole with the description of its identification Reg.21 6 of CEAR 2023 undert ABNS colliery
Grid spring resilient coupling for 2 x 110 kW gearbox, Grid spring resilient coupling for 2 X 150 kW gearbox
Rapid Test Kit for HIV/Syphilis/Hepatitis B Virus (HBV) Hepatitis C Virus (HCV) (Q2), Point of Care Rapid Test Kits for Humans – Dengue, Malaria, Typhoid & Others (Q2), Rapid Pregnancy Test Kit (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
HBsAg ELISA Test Kits (Q2), HCV ELISA Test Kits (Q2), HIV ELISA Test Kits (Q2), Anti - A Blood Grouping Reagent (Q2), Anti-B Blood Grouping Reagent (V2) (Q2), Anti - AB Blood Grouping Reagent (V2) (Q2), Anti - D Blood Grouping Reagent (Q2), Anti-A1 Lectin Reagent (V2) (Q2), Anti- Human Globulin (AHG) Reagent (Q2), Blood Lancets (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete