Loading…
Loading…
5,385 results • Recent activity
Repair and Maintenance of Idgah New Qtr at Bhowra under E.J Area
UNSERVICEABLE PUMP, MOTOR SET AND BED PLATE DISMANTALING FROM THE PONTOON AND FABRICATION NEW BED PLATE WITH INSTALLATION OF PUMP WITH MOTOR SET BORIRA QUARRY FOR DEWATERING THE COAL FACE AT DOCP.
A) Replacement of 2MVA transformer to 3 MVA transformer at langri more substation and installation of 200 mtrs head. (B) Installation of 200 mntrs head ,1480 RPM floW more make pump and Motor-set with bed plate on the pontoon
for 6 inch MS pipe 150mtr and 4 inch dia M.S pipe 200mtr total 400mtr Carrying, laying and jointing from 10 delivery pipe range to fire area at OCP Basdeopur Colliery under Sijua area. (b) Re - joining of 6 inch dia delivery range for 72mtr in Verti
Maintenance of firefighting system of Koyla Bhawan Complex for one year at Koyla Bhawan
Quarterly calibration, cleaning and minor repairing of three nos Road weigh bridges as complying of SOP for one year of DBOCP