Repairing/ Changing of feed chute, Sieve bend holding structure and sieve bend discharge chute of washed coal Screen unit 607-1 to 607-4 of 18M floor of Washery Building at Moonidih Coal Washery.
Fabrication and Installation of 8 Nos. Reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of Raw Coal Section at Monidih Coal Washery.
Testing of 60 MT raw coal receipt road weighbridge and 40 MT road sale weighbridge by placing loose weights of 15 MT (20 kg each) and 10 MT (20 kg each) respectively completing all the required work and regular cleaning of weighbridge platform, area
Dismantling/ Repairing of damaged Gear box its counter weights, pinions etc. for unit 105 conveyor and re-installation of Gear box at Moonidih Coal Washery.
Repairing/ Replacement and Strengthening of discharge chute after dismantling of existing worn-out chute along with replacement of its vibro-motor under middling Silo at Moonidih Coal Washery.
Repairing/ Strengthening and Replacement of discharge chute along with its side skirts after dismantling of existing worn-out chut for unit C-1 belt conveyor at Moonidih Coal Washery.