Complete Repairing/rewinding of 150KVA transformer 11KV/440V make KVA Process T/F Pvt. Ltd. Sl. no. 11/1386 of JOCP Workshop under Block-II Area
Repairing of 8in dis pipe line at 1T patch of ABOCP Mine Block-II Area
Diversion of 10in/8in dia delivery pipe and installation of 3200 GPM and 2000GPM pump at Jamunia Patch ABOCP mine Block-II Area
Replacement of 1400mm width conveyor belt in unit 901, 105 and 1200mm width belting at unit 801-B and 801-A belt conveyor at loading section of Moonidih Coal Washery.
Complete Repairing and Rewinding of Stator of 460KW 6.6KV, slipring Induction Motor with Sl.No. MP/460/1 for Main Pump Room 500MH, Moonidih
Repairing/ Strengthening of discharge chute and its supporting structure of Unit 301-B belt conveyor (reject belt) under Raw Coal Section of Moonidih Coal Washery.