Loading…
Loading…
5,392 results • Latest
the repairing/overhauling of centrifugal pumps 1000GPM 150/200 DST MnP at SB Workshop under Sijua Area
Hoisting and loading of 400 mtr, 250 mtr and 500 mtr 6 inch and 10 inch diameter MS pipes respectively from kuiya colliery for Ena colliery Kusunda Area.
Shifting of 3.3 KV overhead line by Dismantling one pole and two span with Erection of three poles and four Span conductor in J patch near EKG at ADIC
Diversion of 6.6KV overhead line due to advancement of OB dump required for operation of 4000GPM pump at Jharna sump under Muraidih, AMP Colliery, Barora Area.
Shifting of 3.3 KV overhead line by Dismantling two pole and three span with Erection of two poles and three Span conductor near pumping area in J patch at ADIC
For dismantling and erection of 220V O/H line and one Tower near view point, combined seam, haul road, old weighbridge at ADIC