Loading…
Loading…
5,350 results • Latest
Towards repairing of PCB 200A,550V LT Switch at 5 pit substn. LBC(ii)repairing/overhauling of LT Switch GEC make OCB 400A 550V/440V BOCP under Sijua Area
Re-location of unserviceable boiler for water Storage and dust sprinkling at 09 No. Siding of Amal. NT-ST-JG Colliery under Lodna Area
Towards rewinding of a 3 phase lighting Transformer 50KVA,550V/440V at drift of LBC(ii)complete rewinding repairing of 100KVA 550V/440V 3 Phase at Tetulmuri Basti under Mudidih Colliery
Complete rewinding and commissioning of 100KVA 11KV/440V transformer Aluminum Winding installed at Dharia Joba of Gondudih Khasa Kusunda Colliery under Kusunda Area
Annual Testing Required for the stamping of 02 No New 100 Tonne Weightbridge i.e. Kuya DDU and BNR Railway Siding -2 with 33 Tonne Under Bastacolla Area and Shifting of 02 Times 33 Tonne Test Weights i.e. 33 Tonne Test Weights Jointly from both Kuy
Rewinding, repairing and overhauling of ETE make 315KVA, 33KV/440V lighting transformer Sl. No. S-5840-1 at 33KV/11KV main Substation, Southloyabad under Kusunda Area