Loading…
Loading…
5,351 results • Latest
Repairing of 400A, 3.3KV Prabhu Make VCB for Controlling of Face Pumps at KOCP.
fabrication (Casting and machining) of 02 nos. Motor housing rear and cover (dala) and 02 nos. bearing cap (front 1 and rear 1) of 160 KW Motor at Sendra Bansjora Workshop, Loyabad. (Mechanical Repairing of Induction Motor)
Preventive Maintenance of 11KV Overhead Line of Bera Bastacolla Feeder at Golakdih Sub Station under Bastacolla Area.
Complete Repairing of Mine line make 200A, 550V, ACB switch Sl.no. 5148, 125KVA, Transformer controlling switch at Kandra Sub Station Lohapatti Colliery, WJ Area
Repairing of ACB Star Delta Starter Make Mine Line 400Amp /400-V Sl. No.- 95/SD Controlling of Atlas Copco Conveyor Belt at BNR Railway ROCP/SJ
Repairing and overhauling of 800Amps.,550V OCB Switch GEC make SL.No. 40/0135 at Bhurungia Substation under Lohapatee Colliery, Mahuda Group