(A) Erection of 440Volt LT O/H line 14 No attendance room to OB dump power supply motor pump OB dump (B) Erection of 220V LT O/H line 9 seem lighting for motor pump and DM-3/522 shovel ABOCP mine (C) Dismantling, Erection of 6.6KV SF No-(I) (D) Bre
(A) Dismantling, Erection Diversion of 440V LT O/H line power supply Lutipahari Pandey Basti under ABOCP (B) Breakdown repairing of 440V LT O/H line damage by dumper dala near 14 No Attendance room power supply NOCP W/B Attendance room 14 No lighting
Repairing and Rewinding of three (03) nos. 110KW, and two (02)nos. 150KW Induction Motors. Sl. No. 110KW CCS/05,CCS/13 and WS/06, 150KW-CCS/03 and WS/01
Complete Rewinding and Repairing of 120KW,550V Motor for Pump installed at Kapatghat, Moonidih. Sl.No. MND/Kapatghat/120KW/ 02
Repairing and Rewinding of three (03) nos. 110kw (Stator) Induction Motors Sl. No. WS/19,WS/14 and WS/17
Repairing and Overhauling of HT side Vacuum Circuit Breaker of 6.6kv/550V Pearson and Pebbles make 750 KVA TSU (Sl.No.1LA2597) for Main Substation Moonidih