Loading
Loading…
Loading…
5,360 results • Latest
1. Checking alignment of the cracked boom assembly. 2. Cleaning of damage and cracked area by grinding to remove dirt, grease and paint.
1. Checking alignment of the cracked boom assembly. 2. Cleaning of damage and cracked area by grinding to remove dirt, grease and paint.
Repair and Renovation of Pathology department at CHD
The damage structure of the all four side of the cabin strengthening rusted portion of structure cutting and new MS sheet changing by welding.
Diversion of 11KV Amlabad ABNS overhead line for smooth mining operation
Electrical Wiring works of Lodna Masjid under Lodna Area