Loading…
Loading…
5,111 results • Latest
Maintenance of Sub-station and pump room near A-type NPTS under Sijua Area
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Mechanical Repairing/ Restrengthening of bend pulley (02 Nos.) of belt conveyor 201, head and snub drum of conveyor unit 301-B at Moonidih Coal Washery.
Rewinding of 35HP 440V RPM induction make Sl. No 60342M210 motor stator of ropeway fitted at Kandra Colony.
Repairing of Pay Loader No JH 10AE 5371.
Repairing of Pay Loader No JH 10AG 0820.
Jet pump servicing, cleaning, gas filling and repair of 51 nos. Acs under Sijua Area.(including 34 nos. at Sijua Area office,14 nos. at MT Hostel, and 03 nos. of Acs at New Guest House Kendua.(AIR CONDITIONER).
Repairing/Overhauling with material and base plate of Kirlosker Diesel Engine. RB 44-37.2 KV 3phase Sl. No.- 48/1208/8676 at New Sijua Area Office under Sijua Area
Construction of Mahila Thana Bathroom and miscellaneous work under Govindpur Area
R/M of Kali Mandir and Hanuman Mandir at Akashkinaree Tola under Govindpur Area
Modular Extendable Conference Table (V2) (Q2), Chair for General Purpose (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Overhauling and repairing of one no. 1 no of KHOSLA make with Sl.no.14516 and complete rehabilitation of 1 no of Ingersoll Rand Air compressor Sl.No. AHM 900058 with changing of all 24 Nos. of High pressure pneumatic valve
Complete Repairing of Air End/Element of Atlas Copco Compressor (Model-GA160) Qty.-01 Sl. No.-AIA1525439 of Compressor House of Moonidih Colliery
Repairing of Complete Return Roller shaft assembly Apron Feeder of Moonidih Project
Repairing of Poland make gear box, Qty-1 no. having sl.no. 820 GR 1,35,2 of Moonidih Project.
Complete Repairing of a 120HP automatic star delta starter, 550 Volt make Amba speed, Sl.No.A-314-13 for Bhurungiya Town ship Submersible pump at Lohapatti Colliery of Mahuda Group, WJ Area
Complete Rewinding and Repairing of a 100 HP burnt motor and rotor 1480 RPM and 550Volt make kirloskar sl.no. 02 for river side water supply pump of Bhatdee Colliery under Mahuda Group, WJ Area
Manufacturing, supply and Fitting of brass angle guide shoe Qty.12 Nos. for skip no. 1 and 2 of Moonidih Project
Hiring of 2 two Nos Water Tanker of 5000 Liter Capacity for 90 days 2 two Trip at KOCP and ROCP under Bstacolla Area
Complete Repairing of 6UP-4 Pump, 3 Nos. Kirloskar make for underground pumping section of Moonidih Project, WJ Area. Sl.No. 6UP4- 01,02 and 03
Complete Repairing/reconditioning of Beacon Weir pump of Kapatghat, Type 150x200, 120 meters head. Sl.No. Beacon/Kapatghat/01
Complete Repairing of M and P make 6 stage PV-II Pump of LHD-4 Section of Moonidih Project, W.J.Area Sl.No.-MND/CWS/M and P /PV-II,6stage/06
Repairing of 7 nos. NHS qtrs.. near selector and bispatia dhora under Govindpur Area
Repair and maintenance of NHS qtrs. No. 371 and 379 in Mathadih under ABGC, Govindpur Area
Distempering of sinidih Durga Mandir Sinidih under Govindpur Area
Repairing of RHS Idler assembly (01 nos) of L and T CK300 shovel, sl. no. 721 at ABOCP Mines, Block II Area.
REPAIRING AND OVERHAULING OF 400 AMPS 400V, OCB WITH BUSBAR MAKE GEC SL NO 13956 AT SITE OF GOPALICHAK.
Construction and Fixation of lease Boundary Pillar at different Mines of Bastacolla Area.
REPAIR OF BEND AND TWISTED TRANSMISSION BOTTOM GUARD (REAR) OF DOZER D355, SL.NO. 11987.
Repairing of Rear Left side final drive assembly of Water Sprinkler model WS28-2 Sl. No. 28284.
Repairing of Idler Roller Assy. (02 Nos.) of shovel No. - BE-1000 G10252 (Float).
Repairing of Main frame, Diesel tank, Platform and safety glass of operator cabin of motor grader, Sl. No. - 25139 deployed at ABOCP Mine, Block-II Area.
Repair and Maintenance of Quarter Occupied by Shyam Kumar Singh at Gandhi Nagar Bhowra under E.J. Area
Repair and Maintenance of Quarter Occupied by Rajpat Saroj at New Quarter Bhowra under E.J. Area
Strengthening of skip unloading point structure as well as compass path by replacement of damaged/wornout structure members of shaft no. 2 of Moonidih Project.
Dismantling of old and damaged distribution gate and new distribution gate fitting. Alignment checking of skip pocket project 420 MH at Moonidih Ptoject, WJ Area
Aluminium Conductors For Overhead Transmission Purposes (V2) Conforming To IS 398 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7131996 Dated : 27-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 10439940 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a)., EMD & Performance securityshould be 2/8 in favour of Beneficiary, wherever it is applicable. Beneficiary : Public Sector Unit Office of GM(MM), Materials Management Dept, Bharat Coking Coal Limited, Koylabhawan, Koylanagar-826005 (Bharat Coking Coal Limited)
Maintenance of Haulage route from 500MH pit bottom to DR-3 ROK in XVI seam at Moonidih Colliery, W J Area
Supply and Installation of 07Nos. 3-phase, 4-wire, 110V, 5A Energymeter (Trivector Meter) for Energy Monitoring at Different Points under Govindpur Area-III
Complete rewinding and repairing of Aluminium winded Power Transformer, 500KVA, 11KV/550V, Cromptomn Parkinson Make, Sl. No. 29570V of Kharkharee Main Sub-station under Govindpur Area
Complete rewinding and repairing of 1000KVA 11KV/550V transformer make SI.No. 35279 of jogidih colliery under Govindpur
Complete rewinding of Power Transformer Make NA, 300KVA, 6.6KV/550V Sl. No. NA of Katras Regional Store Substation of NAKC under Govindpur Area.
Annual Maintenance Contract of CMD Bungalow and Directors Bungalows for a period of 2 years
Removal and cleaning of loose and jammed coal lumps, fines etc spilled F/B and belt conveyor accumulated and around conveyor structure of F/B at Kessurgarh under ABOCP Mine of Block-II Area
Repair and Maintenance of Drain Bhowra New Quarter at Bhowra Under EJ Area.
UNDERCARRIAGE ASSEMBLY (P. No. 175UCSET01)
Repairing/ Changing of feed chute, Sieve bend holding structure and sieve bend discharge chute of washed coal Screen unit 607-1 to 607-4 of 18M floor of Washery Building at Moonidih Coal Washery.
Fabrication and Installation of 8 Nos. Reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of Raw Coal Section at Monidih Coal Washery.
Testing of 60 MT raw coal receipt road weighbridge and 40 MT road sale weighbridge by placing loose weights of 15 MT (20 kg each) and 10 MT (20 kg each) respectively completing all the required work and regular cleaning of weighbridge platform, area
Dismantling/ Repairing of damaged Gear box its counter weights, pinions etc. for unit 105 conveyor and re-installation of Gear box at Moonidih Coal Washery.