Loading…
Loading…
47 results • Recent activity
Making of 20 nos of cable joint box and 10 nos main switch stand for use of various pumping works and power supply purpose at different place of Bharatpur OCP
Making of cross belt jointing cold patching and drum lagging by cold and hot joint in rubber nylon belt of 1200mm and 1400mm width belt conveyors at CHP and RLS of BOCP for Two years
Dismantling and Erection of Rollers, Brackets of all the conveyor of the plant for 365 days at New Silo, Bharatpur OCP as per the instruction of Engineer Incharge
(1) Fabrication of C.I flange coupling both motor and pump sie with collar with key way holes for fasteners for different pumps (2) Making, Machining , threading EN-19 coupling bolt ,Nut, washer with Rubber Bush for flange coupli
Installation of 36-watt double arm solar lights in the surrounding villages around the mining area Bharatpur Area for compliance of Forest Clearance conditions
A)Making Machining grinding finishing pump shaft 01 Nos(B) Making of body stud 42 Nos(C)Making of neck ring 02 Nos (D) Making of sleeve 02 No. (E) Repairing of complete body Lower Upper Casing 1 No for flowmore pump 200/150 (2 stage) Model P-5932 Ty