Loading…
Loading…
719 results • Latest
BLDC FAN 1200MM (48" ) WITH REGULATOR
LANCE ASSY, MODIFIED, DWN: 038.001. SML. 173
GROUTING MATERIAL, BLAST FURNACE HEARTH (SUPPLY & APPLICATION)
Microprocessor base belt weigher control panel
Arc Flash Suit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MULTIPLE HEAT LADLE SLIDE GATE, SMS-NEW, POROUS PLUG, SMS-NEW
COUPLING, CURVED TOOTH, DWN: 670593/HSM9922, MM: SBK 90, DWN: 671256/HSM-6259
DEWATERING PUMP, MODEL: DJ-6006
EMERGENCY DISC BRAKE ASSLY MIXER CRANE
EMERGENCY DISC BRAKE ASSLY LH CRANE
CHLORINE LIQUID
SUPPLY, INSTALLATION AND COMMISSIONING OF AUTOMATIC SHOT BLASTING AND PAINTING LINE IN HRCF DEPARTMENT OF BOKARO STEEL PLANT
Miner'S Safety Goggles-IS:14352 (Q3), Ear Plugs as per IS 9167 (Q3), Respiratory Protective Devices- Filtering Half Masks (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6698259 Dated : 19-09-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Miner Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
20 T CAPACITY HYDRAULIC RT CRANE
CHAIN ASSY, DWN: BSI-CB-32.11. 10-1000
GRINDING WHEELS FOR COMBI GRINDER, RGBS, GRINDING WHEEL, CYL, DIA 915X100X304.8MM, CYL. GRINDING WHEEL, DIA: 915X100X508MM, CYL. GRINDING WHEEL, DIA 800X76.2X304.8MM
WOVEN WIRE SCREEN PANNEL(10X10 MM), WOVEN WIRE SCREEN PANNEL(12X12 MM), WOVEN WIRE SCREEN OPENING 15X15 MM, WOVEN WIRE SCREEN OPENING 15X20 MM
Mingle Conference Table 18 Seater, Executive Chair Model: - Marvel Mid Back, Visitor Chair Bravo visitor
VERSA NEO HIGH BACK CHAIR
ROTOR ASSY, MODIFIED, DWN: CHP-1736
ENCODER, POG10G M DN 1024 I/M DN2048
HOT STRAND PRESS. RED. UNIT
Chair for General Purpose (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Modular Table/Meeting Table/Centre Table (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Chair for General Purpose (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Revolving Chair (V5) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
ALMIRAH, PLAIN, MINOR, GODREJ INTERIO HIGH BACK REVOLVING CHAIR, Bravo Visitor Chair, Colour-Black, TABLE, EXAMINATION, SURGICAL DOUBLE STEP STOOL MS, EXAMINATION TABLE RTC MATRESS 300 MM, STEEL RACK SIZE 6 36 18 WTH 6 PA, RACK, STEEL, 6FT 36 18IN W 3 PANEL SMALL, HEIGHT ADJUSTABLE SS TOP ROUND STOOL, Open Dustbin Perfo, SIZE 8 12, COMPUTER TABLE MODEL COMPANION C2MAKE, GODREJ TABLE T8
Modular Table/Meeting Table/Centre Table (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
HEAT EXCHANGR RG, HEAT EXCHANGER FG
SAFETY & SHUT OFF BLOCK; F/HYD SYS; B-1&2, BLADDER ACCUMULATOR; F/HYD SYS; B-1&2
SUBMERSIBLE SLURRY PUMP, Q: 1200LPM
MTR, GEARED, 126RPM, MM: 180L4RTPT100TROOLH, MTR, GEARED, 138.4RPM, 12KW, MM: SK62180L4
DRAFT GEAR, DWN: 036.181. 00.126
LED SIGNAL LIGHT UNIT (MAIN ASPECT), RED, LED SIGNAL LIGHT UNIT(MAIN ASPECT), GREEN
ACB, 3P, 415VAC, 1250A, WMP, BRA: E1.2C, 2500A, EKIP-DIP@415VAC, BRA: E2.2N, 5NO+ 5NC CONTACT FOR EACH BREAKER
CASTABLE, HA, F/WBRHF CHARGING UPTAKE (Supply & Application basis)
LIMIT SWITCH, GEARED, 4.1 NMH-699, SERIES51
VALVE DC REF 4WE 10D 3X C G48 N9K4V, VALVE DC REF 4WE 10 E 3X C G48 N9K4V, PRESSURE RELIEF VALVE DBDS 20G 1X 315V, PUMP PN A4VSG 125 E01 3XRPPB10H049N, V RING V 325 A PN R939004058, BEARING PEDESTAL BB46KS0005 R939002854
CONTROLLER P. N. 1623287302, Installation & upgradation of Controller, MK4TO MK5 UPGRADE ZH4000-16000, AIE2 REGULATOR, PN: 1900071052
SINGLE CHAIN CONV. G. BOX, 041.001. 09.268
Liquid Argon(LAR) in cryogenic Container
ACB, UPTO 690V AC, 800A AT 55 DEG. C, 3P, EDO, Applic. for Retrofitting of LT ACB 800A
ALUMINIUM PLATFORM STEP LADDER, 4FEET
Sofa (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MAESTRO BACK UNIT(GODREJ INTERIO)
SAMPLER, LOLLY POP, DIA: 6MM
Control Panels of MH, LT, CT & PP
GEAR BOX, HELICAL BEVEL REDUCTION, BEVEL HELICAL GEAR BOX, RATIO: 24.786: 1
Handling, Transport and Other Mining Services - Percentage quote based - Composite contract for Mechanized, Excavation, Shifting, Screening and stack preparation of 80, 000 Te of Iron Ore screened dumped fines at Gua Ore Mines, JGOM, SAIL
WIRE SET 1 X7, X8, X9, WIRE SET 2 X10, X11, X13, DANFOSS OPT B5 V, CODE NO 181B0304, WIRE KIT FOR F19, DANFOSS NUMERIC KEYPAD, CODE 181B0332, RECTIFYING BOARD, 181B0700, DRIVER BOARD, 181B0776, DRIVER BOARD 500 690V, 181B0777, CHARGING CIRCUIT AFE FFE F19, CHARGING CIRCUIT AFE FFE FI10, DRIVE, NXI02055 A0T0ISG A1A2000000, NXIO2055 AOTOISF A1A2B4C200, NXI00875 A2T0CSV A1A2B4C200, NXI01405 A0T0CSV A1A2000000