Loading…
Loading…
362 results • Latest
Manufacturing Supplying Installing Testing and Commissioning of Passenger lift 2 Nos at J1 and J2 Oshiwara Officers Quarters at Goregaon west
Electrification of proposed Aranya North Tower 33KV Receiving Sub-Station on the plot Bearing C.S. No. 593 of Mazgaon Division at Rambhau Bhogale Marg, Byculla.
Replacement of Mains from individual flats to main switch in the Meter cabin of A and B building at Deonar Staff Quarters.
Supplying, Installation, Testing and Commissioning of 3 Nos. of 20M raising and lowering type High Mast along with related electrical work for Yard Lighting at Malvani Bus Depot.
Annual Maintenance Contract of Fire Alarm System installed in Ticket and Cash Department at 27 Bus Depots of the Undertaking for three years.
Replacement of Mains from individual flats to main switch in the Meter cabin of E and F building at Deonar Staff Quarters.
Thermostat EV unit viscous clutch Flywheel Ring
Clutch Release Bearing Thrust Washer 1st/2nd gear Clutch Housing Bolt Flange.
Purchase of H D Foam mattress with handloom removable cloth cover and Cotton Pillow with Cotton cloth cover with Cotton Bedsheets
4 WAY L. V. DISTRIBUTION PILLAR
1. STEEL EXECUTIVE REVOLVING CHAIRS 2. COMPUTER REVOLVING CHAIRS 3. STEEL CUPBOARD
VARIOUS TYPES OF OFFICE FURNITURE
STEEL EXECUTIVE REVOLVING CHAIR
Padlock Brass 65mm 2.1/2 7 Levers
Hacksaw Blade 300 18 TPI
Tarpauline Fabric 5.5 X 5.5 Mtrs.
Tarpauline General 5.5 x 5.5 Mtrs. Brown Grey
Tarpauline Jointer 5.5 x 5.5 Mtrs. Brown
Purchase of Multipurpose Galvanized M.S. Angle Bracket with C Clamp for Festival
L.V. DISTRIBUTION PILLARS OF VARIOUS RATINGS
Availing SMS GAteway Services for Two years OR till quantity is exhausted
440V, 56 KVAR, O/D, APP TYPE CAPACITOR BANK
Biennial Rate Contract for Purchase of 11kV, 250MVA, Indoor Vacuum Circuit Breakers Switchgears for Distribution Sub-Station with Horizontal Isolation, as per the Undertakings specifications and drawings.
Appointment of Accredited Energy Auditor to conduct an Annual Energy Audit for each of the financial years 2025-26, 2026-27 and 2027-28 (i.e., for a total of three financial years).
MODIFIED MINI PILLARS
FUSE BASE HRC 630 AMPS
56KVR INDOOR CAPACITORS (WITH 160A MCCB)
11KV 350MVA Switchboard 9 panel set of VCB SK/PRO(2024)/78/80/81/82 and SK/PRO(2024)79
Alluminum Alloy Plates
5MVA, KNAN, 33kV- 11kV Power Transformers, using synthetic Ester oil as liquid insulator with Accessories and Spares and 8-10 MVA, ONAN/ONAF, 33kV-11kV Power Transformers along with Accessories and Spares.
Supply of 11kV/415V 630kVA 1600kVA and 1000kVA Single Ratio VPI Resin Impregnated Dry type AN Distribution Transformers of various Ratings
Plastic Putty
1.1kV, 8C x 4 Sq.mm and 4C x 2.5 Sq.mm, Copper FRLS Control Cables
1) Crankshat 2) Element Kit Spinion 3) Thermostat ES Water Pump 4) Thermostat Es Water Pump 5) EGR Temperature Sensor 6) EGR Differential Pressure Sensor
Purchase and Engraving of Silver Medals 15gms.to be presented to the employees on the occasion of the BEST Din 2026
Porcelain Connector for SIMHA Meter Board (Box)
APPOINTMENT OF AUCTIONEER FOR CONDUCTING E-AUCTION
M S WELDING ELECTRODES
Procurement of Nut Brass 6 mm, Bolt Galvanized Iron 35 mm X 12 mm H H, Bolt M S 35 mm X 10 mm H H and Washer M S 14 mm
NUT SELF LOCKING REAR COVER OIL SEAL FORK 2ND 3RD
Procurement of Tape P V C Yellow and Black
Purchase of Switch Box B type with FRP Sliding Cover
HOSE THERMOSTAT TC OUTLET IC OUTLET WHEEL HUB INNER HOSE UPPER DAT OUTLET FILL LINE RAIDATOR LOWER DAT THERMOSTAT
SYNTHETIC ENAMEL EXTERIOR PAINT (FINISHING) BLACK
COWL WIRING HARNESS
Re-Rubberising of Tyre Rear Wheel of Battery Operated Brush Truck
Purchase of HP Laser Jet Enterprise 507dn Printer or latest equivalent printer with 1 year warranty and 5 years extended warranty
Procurement of Heater without perforated cover for switch gear panel.
DRAG LINK ASSEMBLY
DEARATION TANK ASSY. AND FUEL TANK CAP