Loading…
Loading…
1,090 results • Latest
Voltas Storage Type Drinking Water Cooler of Cooling Capacity -, Voltas Storage Type Drinking Water Cooler of Cooling Capacity - 15 litre/hour
Vault (Strong Room) Door as per IS 11188 (Q2) (3 (3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
All in One PC (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7034595 Dated : 30-12-2025 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank Bank Of Baroda EMD Amount 30000000 ePBG Detail Advisory Bank IDBI Bank (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 64 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/14 Beneficiary : Deputy General Manager Centralized Procurement and Vendor Management Vertical, Technology Services Wing, 1st Floor, Naveen Complex, 14, MG Road. (Pankaj Praveen)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
BOQ 1, BOQ 2, BOQ 3, BOQ 4, BOQ 5
1 ton 5 star ac with stabilizer and timer
1ton5star ac with stabilizer, timer
Security Manpower Service (Version 2.0) - Hotel, Banks; Unarmed Security Guard
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))
Security Manpower Service (Version 2.0) - Hotel, Banks; Armed Security Guard
Unbranded Stainless Steel Grade 316 galvanized Shelf Rack With 5-, Unbranded Stainless Steel Grade 316 galvanized Shelf Rack With 5-Shelf (including top shelf)
RK FURNITURES--R.K.FURNITURES Floor Standing Storage Unit With, RK FURNITURES--R.K.FURNITURES Floor Standing Storage Unit With door With Stainless Steel
ALBERTSONS Loose Currency Desktop/Table Top-Type Currency, ALBERTSONS Loose Currency Desktop/Table Top-Type Currency Counting Machine having counting speed Upto 1200 currency notes per minute
Liability Insurance Service - Director and Officer liability coverage
High End Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Computer Printer (V2) (Q2), Television (V3) (Q2)
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))
Hitachi 5 Star Wall Mount Type Split Air Conditioner of Capacity, Hitachi 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 0.8 Ton - 1.2 Ton
Hiring of Agency for IT Projects- Milestone basis
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Hiring of Agency for IT Projects- Milestone basis
Revolving Chair (V5) (Q2), Chair for General Purpose (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2) (3 (3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))
Custom Bid for Services - SELECTION OF VENDOR FOR IMPLEMENTATION OF APPLICATION BASED SMART LOCK FOR STRONG ROOM DOORS FOR A PERIOD OF 5 YEARS IN CANARA BANK Similar Category Alarm Service
Hiring of Agency for IT Projects- Milestone basis
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))
BLUE STAR 3 Star Wall Mount Type Split Air Conditioner of Capacity, BLUE STAR 3 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.8 Ton - 2.2 Ton
BLUE STAR 2 Star Wall Mount Type Split Air Conditioner of Capacity, BLUE STAR 2 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.8 Ton - 2.2 Ton
GODREJ SECURITY SOLUTIONS Deposit safe (Non Tool Resistant) An, GODREJ SECURITY SOLUTIONS Deposit safe (Non Tool Resistant) An Individually secured container for Paper / Cash / Documents
GODREJ SECURITY SOLUTIONS Safe Deposit Locker Cabinets As, GODREJ SECURITY SOLUTIONS Safe Deposit Locker Cabinets As Per IS 5244
ALBERTSONS Stainless Steel Automatic Box Strapping, ALBERTSONS Stainless Steel Automatic Box Strapping Machine With
NUMAX 5 KVA Online UPS with 240 minute Backup
Nilkamal High-back Revolving Chair of Adjustable height with, Nilkamal High-back Revolving Chair of Adjustable height with Wheels
NUMAX 3 KVA Online UPS with 120 minute Backup
Fabteq High-back Revolving Chair of Adjustable height with, Fabteq High-back Revolving Chair of Adjustable height with Wheels
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Safe Deposit Locker Cabinets conforming to IS 5244 (V2) (Q2) (3 (3 ))
Hiring of Agency for IT Projects- Milestone basis
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))