Loading…
Loading…
261 results • Latest
PROV ANNUAL COMP MAINT CONTRACT OF THYSSEN MAKE STRETCHER LIFT OF JAWAHAR LAL NEHRU HOSPITAL GAS RAHAT BHOPAL
PROV ANNUAL COMP MAINT CONTRACT CMC OF KONE MAKE ELEVATOR AT INDIRA GANDHI HOSPITAL GAS RAHAT BHOPAL
AR WORK FOR CLEANING OF OVERHEAD TANK/SUMPWELL/WATER TANK BY ECO FRIENDLY AND BIO DEGRADED CHEMICAL TREATMENT AT MLA REST HOUSE UNDER SUB DN 5
SUPPLY INSTALLATION OF 2 TR SPLIT AIR CONDITIONER IN ROOM NO 318 NETWORK OPERATING CENTRE AT VIDHAN SABHA BHAWAN BHOPAL
Interior and exterior white washing, color washing and painting work of Mantralay Vallabh Bhawan-3, under Capital Sub Div. No.04, Bhopal 2ND Call
A/R, S/R maintenance work of Mantralaya Vallabh Bhawan- 1, under Capital Sub Div. No.04, Bhopal 2ND Call
Water proofing, paver block and other misc. work for CPA Building (west side) Bhopal (Bittan Market) 2ND Call
Interior and exterior white washing, color washing and painting work of Mantralay Vallabh Bhawan-2, under Capital Sub Div. No.04, Bhopal 2ND Call
Proposed construction of record room Furniture work on Terrace at Lokayukt office, Bhopal
A/R, S/R annual maintenance work for CPA Building, Bhopal (Bittan market)
Various A/R, S/R Anurakshan and other allied works in 24 Suites guest house and CPA office building and Residential Qtrs under Capital Sub Div-02, PWD, Bhopal
Repair renovation and deposit work for non residential building under construction sub Divivision No.6, C.P.A. PWD,, Bhopal
Construction of CC road from Kolar six lane (Lotus Hospital) to Dr. Shyamaprasad Mukharji college (Kempfort school to Raljeev Gandhi college Saliaya Bridge), Bhopal (length 1.10 KM)
PROPOSED CONSTRUCTION OF MATERIAL TESTING LAB i/c ELECTRICAL WORK AT PRAKASH TARAN PUSHKAR CAMPUS, BHOPAL
AR WORK FOR ANNUAL MAINTENANCE AND OPERATION OF FIRE HYDRANT AND FIRE EXTINGUISHER SYSTEM AT VIDHAN SABHA BHAWAN BHOPAL
Maintenance of Lawns and P/F of different Varieties of Plants Grass etc. at Park Under Lokayukt Campus, Bhopal
PROVIDING ANNUAL OPERATION OF FIVE NOS ELEVATOR INSTALLED AT VNDHYACHAL BHAWAN BHOPAL
PROVIDING ANNUAL COMPREHENSIVE MAINTENANCE AND OPERATION CONTRACT OF THE ONE NOS DG SET INSTALLED AT SATPUDA BHAWAN BHOPAL
PROVIDING AND FIXING OF ELECTRIFICATION WORK IN CPA BUILDING BHOPAL
PROVIDING COMPREHENSIVE MAINTENANCE AND OPERATION OF ELECTRICAL INSTALLATION OF CPA BUILDING BHOPAL
AR WORK FOR THE RENOVATION OF TAR FELT (WATER PROOFING TREATMENT) ON THE ROOF OF BLOCK NO.3 AT MLA REST HOUSE BHOPAL
AR WORK FOR GENERAL REPAIRING OVERHAULING SEVICING AND INSTALLATION OF ROLLING SHUTTER OF GARRAGES SHOPS AND STORE AT DIFFERENT BLOCK AT MLA REST HOUSE BHOPAL
Maint. works at various small parks under Capital division No 01 CPA PWD Bhopal
AR WORK FOR RENOVATION OF BOUDARY WAL AND HUT AND UP GRADATION WORK OF PAVER BLOCK IN YUVA SADAN AT MLA REST HOUSE BHOPAL
AR work for Providing Video recording system in House of Vidhan Sabha Bhopal
AR work of Electrical Renovation of Block ABC and Garrage at MLA Rest House Bhopal
AR WORK FOR SUPPLY AND INSTALLATION OF WATER COOLER AND FILTER AT VIDHAN SABHA BHAWAN BHOPAL
N/A
AR work for Electircal renovation of Block 2 N2 at MLA Rest House Bhopal
AR WORK OF BT RENEWAL OF MAIN ROAD AND APPROACH ROAD OF MLA REST HOUSE BHOPAL
Construction of Road From Rajeev Gandhi Nagar Ayodhya Byepass to Jeet Homes, Bhopal Length 0.800 Km.
Strengthening of central verge catch water drain hard paver shoulder and junction improvement for master plan road at Alkapuri west to Shakti Nagar Via DRM Road, Bhopal
Junction improvement water duct and raising of central verge from DRM Office to upto MGM School, Bhopal
Upgradation of water logging area (Jalbharav) for BHEL Sangam to Rajat Vihar Via Shikshak Congress Length 31.00 M
Raising of Central Verge painting of footpath, crush barrier, junction improvement at High level bridge near J.K. Hospital Danish bridge at master plan road from Danish Bridge to Apolo Sage Hospital Via Indus square at Bawadiyan Kaln, Bhopal
AR WORK FOR DRY CLEAN WASHING HOT IRON OF BED SHEET AND PILLOW COVERS OF VARIOUS BLOCKS AT MLA REST HOUSE BHOPAL
Interior and exterior white washing, color washing and painting work of Mantralay Vallabh Bhawan-1, under Capital Sub Div. No.04, Bhopal
AR, SR Anurakshan work at 228 Qtrs, Kotra Sultanabad Residential Govt. Qtrs under Capital Sub Div-02, PWD, Bhopal
Construction of common toilet block and development of campus at NITTTR, Bhopal
Improvement for balck spot and left turn Nehru Nagar Square road under Capital Division No.I, C.P.A. P.W.D., Bhopal
ELECTRIFICATION WORK AND SHIFTING OF HT LT LINE AT AWADHPURI CPA BHOPAL
ELECTRICAL WORK AND SHIFTING OF HT LT LINE AT AIIMS HOSPITAL BHOPAL
PROV ANNUAL COMPREHENSIVE MAINTENANCE CONTRACT OF ESCON MAKE TWO NOS ELEVATORS INSTALLED AT F TYPE 36 QTR NEAR MATA MANDIR BHOPAL
PROVIDING ANNUAL COMPREHENSIVE MAINTENANCE CONTRACT OF ESCON MAKE ONE NO ELEVATOR INSTALLED AT CHIEF ELECTORAL OFFICER BUILDING NIRWACHAN SADAN ARERA HILLS
Repair and redevelopment of footpath area from Vikas Bhawan to Chief Election Office at Arera Hills, Bhopal
Maintenace of Lawn and Horitculture and Civil Works of E-1, E-2 and other Parks Under Capital Sub Divn. No 06, CPA PWD, Bhopal
A/R, S/R maintenance work of Mantralaya Vallabh Bhawan- 3, under Capital Sub Div. No.04, Bhopal
Melamine polishing i/c necessary repairs of wall paneling work of Mantralay Vallabh Bhawan-3, under Capital Sub Div. No.04, Bhopal
ELECTRIFICATION WORK AT SHOURYA SMARAK BHOPAL ZONAL
A/R, S/R maintenance work of Mantralaya Vallabh Bhawan- 2, under Capital Sub Div. No.04, Bhopal