Loading…
Loading…
15 results • Latest
Construction of Distribution system for 5052.68 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 60.304 km to 71.505 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of ABP
Construction of Distribution system for 7171.77 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 40.927 km to 45.570 km through Under Ground Pipe Line Irrigation system (Gravity Flow)of ABP
Installation of CCTV camera at Anandapur Barrage site.
Geophysical Investigation involving Electrical Resistivity Tomography (ERT), Seismic Refraction Tomography (SRT), Multichannel Analysis of Surface Waves (MASW) and Spontaneous Potential (SP) of Anandapur Barrage, Odisha.
Repair and rehabilitation of approach road of Anandapur Barrage connecting to N.H.-20, Anandapur Barrage and S.H.-53.
Engagement of hired vehicle used by the Superintending Engineer, Anandapur Barrage Division, Salapada for the year 2026-27
Hiring of private vehicle for official use by Assistant Executive Engineer, Anandapur Barrage Sub-Division No. I, Salapada for the year 2026-27 from 01.04.2026 to 31.03.2027
Hiring of one no. of Vehicle for the period from 01.04.2026 to 31.03.2027 to be used in the office of the Superintending Engineer,Soro Canal Division,Soro .
Hiring of one no. of Vehicle for the period from 01.04.2026 to 31.03.2027 to be used in the office of the Assistant Executive Engineer ,Soro Canal Sub- Division No- III,Balasore
Hiring of one no. of Vehicle for the period from 01.04.2026 to 31.03.2027 to be used in the office of the Assistant Executive Engineer ,Soro Canal Sub-Division No- II,Nilgiri.
Hiring of one no. of Vehicle for the period from 01.04.2026 to 31.03.2027 to be used in the office of the Assistant Executive Engineer ,Soro Canal Sub- Division No-I,Soro
Engagement of hired vehicle used by the Chief Construction Engineer, Anandapur Barrage Project, Salapada for the year 2026-27
Engagement of hired vehicle used by the Executive Engineer D and M office of the Chief Construction Engineer Anandapur Barrage Project Salapada for the year 2026 27
Engagement of hired vehicle used by the Assistant Executive Engineer, Anandapur Barrage Sub Division No. II, Salapada for the year 2026-27
Engagement for hiring vehicle to be used by the Assistant Executive Engineer, Anandapur Canal Sub-Division No.I, Salapada for the period from dt.01/04/2026 to 31/03/2027.