Loading…
Loading…
351 results • Recent activity
Repair of 5 nos RCC bridge over DWF Channel at Ghoshpur, Chandipur, Bamunia, Nalmuri and Borali under C.D.O Sub-Division III of C.D.O Division in Block -Bhangore I, Haroa, P.S-Bhangore , Haroa,Dist.-South , North 24 Parganas.
Repair to R.C.C. Single Lane Bridge at Ch. 809.00 over S.W.F. Channel at Nalmuri in Block-Bhangore-I, Dist-South 24 Parganas under Calcutta Drainage Outfall Sub Div. No. III of Calcutta Drainage Outfall Division
Clearing and removing of water hyacinth of Rajapur Branch Khal - I and II for a total length of 7.0 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Jagatballavpur and Domjur, Dist- Howrah
Clearing and removing of water hyacinth of Saraswati River from Jelepara to Khutir Pole for a length of 6.50 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Domjur, Dist-Howrah
Clearing and removing of water hyacinth from Gurer Khal of length 4.50 Km and Sutir Khal -I of length 1.00 Km for the period of 365 Days, during the year 2026-27 in Block- Panchla, Dist. - Howrah
Clearing and removing of Water hyacinth of Rajapur Main Khal from 10.00 km to 28.00 km and Kamarnala Khal for a length of 2.8 km for the period 365 days during the year 2026-27 in Block and P.S.-Panchla and Jagatballavpur ,District-Howrah