Loading…
Loading…
351 results • Recent activity
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.7200.0 m to 12500.0 m of Howrah Drainage Channel for the period of 365 days , Bankra-II G.P , Chamrail
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.3000.0 m to 7200.0 m of Howrah Drainage Channel for the period of 365 days, Bankra -II G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc including clearing of Jungles along the slope of bank from ch.0.00m to 800.0 m of of Branch channel IV and from ch. 0.00 to 6880.00 of Branch channel-V for 365 days
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch. 3200 m to 4000.0 m of Sheorapota khal for the period of 365 days Sapuipara -Basukhati Chawakpara - Anandanaga
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 3200.0 m of Sheorapota khal (U-trough) and 0.00 m to 675.0 m of Nayanjuli khal and 0.00 to 2000.0 m
Restoration work at Right Bank of River Hooghly for a total length of 40.00 metre at Karamchatala in Uluberia Municipality of Ward No. - 21 , in P.S-Uluberia, District-Howrah.