Loading…
Loading…
383 results • Recent activity
M/R to Two vent Hume pipe Sluice over Joynagar Khal in G.P - Belari, Block - Shyampur-I, P.S. - Shyampur, Dist - Howrah
M/R to Damage repair and restoration work at both side of Syphon over Short Cut Diversion Channel in G.P-Joypur, in Block-Amta-II, P.S-Joypur, District-Howrah.
Re-Construction of Chandipur wooden bridge (15.00m long) over Medinipur Main Canal of Maheshpur G.P-, Block-Uluberia-I, P.S-Uluberia, District-Howrah under Rajapur Section of Seijberia (I) Sub-Division Of Lower Damodar Construction Division.
FPM work and sluices sealing at Damodar Left and Right from Mahisrekha Bridge to Purnal, Khajjuti to Chandrapur , Dhyannyagori, Narayani, Gaighata left upto Heop Bund and Right Khalna, Tazpur and Takipara Circuit Embankment during the monsoon of 202
Flood Precautionary Measure (FPM) of Hooghly right embankment from Purba Basudebpur Battala to Raghunathpur sluice in connection with monsoon-2026 in GP Belari, Block Shyampur-I, District Howrah
F.P.M works and sluice sealing works in the Right bank of S.C.D.C from Thalia to Bakshi for the length of 11.60 km in G.P -Thalia, Jhamtia, Khalna, Kashmoli, Block- Amta-II, P.S- Joypur, Dist-Howrah