Loading…
Loading…
351 results • Recent activity
Restoration of damaged right bank of Lower Bagjola Khal from 14.120 KM to 14.185 KM at Block Bhangar II, PS Polerhat and Dist.South 24 Parganas
Restoration of damaged right bank of Lower Bagjola Khal from 14.620 km to 14.695 km at Block Bhangar II , Ps Polerhat and Dist South 24 paraganas
Restoration of damaged right bank of Lower Bagjola Khal from 14.520 km to 14.570 km at Block Bhangar II, Ps Polerhat and Dist South 24 paraganas
Periodical maintenance to Sech Abasan quarter complex along with annual upkeeping work of Quality Control Lab and State Data centre, FF block, Sector III, under Metropolitan Drainage Division No. I for the year 2026 27
Restoration of damaged right bank of Lower Bagjola Khal in between 27.250 KM to 27.450 KM at Block and PS Haroa in the District of North 24 Parganas.
Annual maintenance by Clearing and removing water hyacinth including thorny jungles, semisolid mass along with jungle cutting of the bank from 24.005 Km. Radhanagar-I Composite Bridge to 28.800 Km. Kulti of Lower Bagjola Khal for 1 year, N24PGS