Loading…
Loading…
497 results • Recent activity
O and M of Barrage Gates.JOB 2
O and M of Barrage Gates. Job1
Restoration of Damaged Temporary Diversion channel of Nogli Power House (2.5 MW) Intake from RD 130 to RD 200 Meter damaged due to heavy Flash flood in Nogli Khad under Resident Engineer, Ganvi Power House Division, Jeori, Shimla, H.P.
Repair of 21 Bucket Pelton Runner including building up of eroded buckets to its normal profile through weld deposition ,grinding ,stress reliving and static balancing for the 2x11.25MW Ganvi Power House Stage-1
Construction of PCC protection step wall at the Shamshan Ghat of Gram Panchayat Aut along the rim of Larji Reservoir on right bank under Sr. Executive Engineer, Civil Mtc. Division, HPSEBL, Thalout, Distt. Mandi H.P.
Re-filling of various types of fire extinguishers at 2X2.25 MW BAP Kafnoo power house under Bhaba Power House Division, HPSEBL, Bhabanagar for FY 2025-26