Loading…
Loading…
4 results • Latest
Construction of New drain in Balisira from km 144.100 to 145.000 km (RHS) of NH-157(left over by EPC project) for the year 2025-26
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead.
Repair and Rehabilitation Work of Adangi Bridge at Km 254.900 of NH-59 near Pipalapanka for the year 2025-26
1 Providing and fixing drainage spouts complete as per IRC:SP-42 with 150mm dia PVC pipe and downtake length im as per E.I.C
SR TO NH-26 FROM CH 345480 TO CH 347450, CH 347900 TO 348600 AND CH 349200 TO CH 351480 JEYPORE GHAT FOR THE YEAR 2025 26
Providing and applying Tack coat with bitumen emulsion on prepared surface including cleaning of road surface and spraying primer at the rate of 0.20kg/sqm using mechanical means as per clause no.501.5.2, 502 of MoRT&H specification and direction of the EIC.
Construction of R.C.C. Drain along NH 353 km 75.870 to 78.330 RHS for the year 2025-26
Earth work in excavation in hard soil or gravelly soil including dressing and levelling the bed