Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
155 results • Latest
Construction of pucca water course in chak 6BGM
Construction of pucca water course in chak 12BD
Construction of pucca water course in chak 18BD-A
Construction of pucca water course in chak 16BD
Filling of rain cuts/ghara/hole/depression from RD 555 to 671 B/s of IGF for the year 2026-27
Filling of Rain cuts/gharas/hole/depression from RD 0 to 120 of IGMN for the year 2026-27
Removal of floating weeds (Jal kumbhi and other) from RD 120 to 243.500 B/s of IGMN for the year 2026-27
Removal of floating weeds (Jalkumbhi and other) etc from RD 555 to 671 of IGF for the year 2026-27
Filling of rain cuts/gharas/hole/depression from RD 120 to 243.500 of IGMN for the year 2026-27
Removal of floating weeds (Jal kumbhi and other) etc from RD 0 to 120 of IGMN for the year 2026-27
Regulation of Head and cross Regulator at RD 195.400 and RD 237.050 of Anoopgarh Shakha from 01.04.2026 to 31.03.2027
Regulation of Head and cross Regulator at RD 281.000 and RD 321.000 of Anoopgarh Shakha from 01.04.2026 to 31.03.2027
Relining of E Minor from RD 0.000 to 14.000 of Gang Canal System
Flood prevention, protection and strengthening of banks of ghaggar river nali bed during flood period for the year 2026-27 in Jurisdiction of Ghaghar Sub division
Protection and strengthening of bank of Ghaggar Nali river during flowing period for the year 2026-27
Flood prevention, protection and strengthening of banks of ghaggar river nali bed during flood period of the year 2026-27 khara sub division
Flood prevention, protection and strengthening of banks of ghaggar river nali bed during flood period of the year 2026-27 Pilibanga sub division
General AM and R of channel and head works in Regulation Sub division 2nd Hanumangarh for the year 2026-27
Bush or Jungle clearance from side slopes of lined channels with khurpa of Sadul Branch RD 0 to 198 700 Both side and KS Branch RD 0 to 54 148 Both side for the year 2026 27
Extracting floating weeds at various Head and cross Regulator of Sadul Br RD 0 to 198 700 and Karni singh branch RD 0 to 54 148 for the Year 2026-27
Establishment of Oil Processing Unit at Nohar II Sub-Project Stage – 2, District Hanumangarh
Strengthening /up-gradation of infrastructure of HWMI Bikaner- Computer and allied items/ net working /EPBAX etc for various labs / adm block etc. (P 461)
Special Watch and ward of works from RD 42.000 to 75.000 of GDC in section IIIrd of RWSRP Sub division 1st hanumangarh during the flood period from 15 june 2026 to 15 oct 2026
Special Watch and ward of works from RD 0.000 to 20.000 of GDC and Talwara protection bundh from RD 0.000 to 18.000 in section Ist of RWSRP Sub division 1st hanumangarh during the flood period from 15 june 2026 to 15 oct 2026
Annual maintenance repair of Karniji link channel and depressions under RWSRP sub div IlI suratgarh during year 2026-27
Special Watch and ward of works from RD 20.000 to 42.000 of GDC in section IInd of RWSRP Sub division 1st hanumangarh during the flood period from 15 june 2026 to 15 oct 2026
AM and R of Ghaggar diversion channel of RWSRP Sub div Ist hanumangarh during year 2026-27
Repairing of Gates and Structure and at Cross Regulator at RD 42.370 of GDC
Repair of gates at Escape S 8 and Jungle clearance of Escape channel under RWSRP Sub Division 3rd Surthgarh
Special watch and ward of works from RD 142.000 to 158.700 of GDC in section IInd of RWSRP Sub division flood period from 15 june 2026 to 15 oct 2026
Annual maintenance repair of Ghaggar Diversion Channel of RWSRP Sub Div IInd Hanumangarh during the year 2026 27
Special watch and ward of works from RD 120.000 to 142.000 of GDC in section IIIrd of RWSRP Sub division ii Hanumangarh during the flood period from 15 June 2026 to 15 oct 2026
Special Watch and ward of North protection Bundh, South protection bundh and Punjabi Mohalla bundh at section IVth of RWSRP sub div 1st Hanumangarh during the flood period from 15 june 2026 to 15 oct 2026
Watch and ward of works of RWSRP Sub division 3rd Suratgarh during the flood period from 15 June to 15 oct 2026
Auction of two Condemned Vehicles at XEn regulation division Hanumangarh
Special watch and ward of works from RD 98.000 to 120.000 of GDC in section IInd of RWSRP Sub division flood period from 15 June 2026 to 15 oct 2026
Special watch and ward of works from RD 75.000 to 98.000 of GDC in section Ist of RWSRP Sub division flood period from 15-06-2026 to 15-10-2026
Construction of pucca water course in chak 8 DPN
Construction of pucca water course in chak 7 NTR
Construction of pucca water course in chak 3 CHN
Construction of pucca water course in chak 2 BDM A
Construction of pucca water course in chak 18 AMS
Construction of pucca water course in chak 10 DPN A
Construction of pucca water course in chak 2 BDM B
Construction of Causeway (Bridge) in Ghaggar River (Depression no.1) to connect Bherusari - Khedasari village Near Chak 3SPD
Repair and Renovation work of 5 Nos Escape Channel Gates at RD 165 of IGMN Including Super Structure and All Hoisting Asembly
Strengthening /up-gradation of infrastructure of HWMI Bikaner- Computer and allied items/ net working /EPBAX etc for various labs / adm block etc. (P 461)
Regulation of Ballewala Head RD 45.00 Khakha Head RD 368.423, Shivpur Head RD 423.368 of Bikaner Canal, Y-Head RD 31.300 of GCF &amp Bifurcation Head Tail of LNJI Branch at RD 16.800 for the year 2026-27
Regulation of Gang Canal Feeder at Sadhuwali Head RD 36.300, Kaluwala Head RD 48.750, Netewala Head RD 82.383 &amp Sulemanki Head RD 134.590 for the year 2026-27
Regulation of Faquirwali head RD 185.662, ps head RD 204.793 &amp Dabla head RD 240.030 ffor the year 2026-27