Loading…
Loading…
126 results • Recent activity
A/R and M/O to various roads under PWD Division NWR-1 during 2026-27. (SH Providing services of Office Staff in Sub Division office NWR 13 )
Remodeling of exiting storm water drain with Precast Factory made RCC drain as per New Master Drain Plan 2025 at Gyan Shakti Mandir Marg under Sub Division NW R-14 of NWR-1 Division PWD, Delhi during 2025-26.
Remodeling of existing storm water drain with Precast Factory made RCC drain as per New Master Drain Plan 2025 at Maharaja Aggarsen Marg under Sub Division NW R-14 of NWR-1 Division PWD, Delhi during 2025-26
Remodeling of existing storm water drain with RCC precast drain as per New Master drainage plan 2025 at Police Station Road from Sultanpuri Bus terminal to Flood Control Drain under Sub Division NWR-21, Division NWR-2, During 2025-26.
Remodelling of pipe drain into RCC drain on Bhao Rao Devras Marg (from Pt. Deen Dyal Upadhyay Marg to BG-7 Gate) under Sub Division NWR-24, Section-I, Division NWR-2, During 2025-26.
Restoration of road surface and repair of trenches cut by various agencies like DJB, IGL, TPDDL, Airtel, other civic agencies under section-I and II under Sub Division NWR-25, Division NWR-2 during 2026-27.