Loading…
Loading…
510 results • Recent activity
Soil investigation work for the proposed permanent protection work to the Hooghly Left Embankment within Mouza - Naldari, Block - Budge Budge-II, Dist-South 24 Parganas.
Emegent Restoration work of Sundarban Embankment damaged due to full moon kotal on and from 04.12.25 to 09.12.2025 for a length of 80.0M in Between Ch. 33.710 Km to Ch.33.790 Km at Mouza-Nadavanga,facing river Muriganga , Block-Namkhana under
Bathymetric Survey of Sutarbag river from Satpukuria 07 vented sluice to Sutarbag Bridge ( L-14.50 km.), Khari Khal from Koutala Rd to Kharapara(L-7.50.Km.)and Br. Canal of Moni at Nalua(L-2.20 Km.)flowing through different mz. under JID (2nd call)
Emegent Restoration work of Sundarban Embankment damaged due to full moon kotal on and from 04.12.25 to 09.12.2025 ,for a length of 55.00 M in Between Ch. 13.480 Km to Ch.13.535 Km at Mouza-Durganagar ,facing river Muriganga , Block-Namkhana
Strengthening of embankment along the left bank of River Ichamati for a length of 60 metre near Sangrampur Kali Mandir Ghat at Mouza Sangrampur, in Block Basirhat I, P.S Basirhat, Dist. North 24 Parganas of Basirhat Irrigation Division.
Back feeding of water through Kulpi Sluice Gate 3 Vent throughout the Boro season of 2023-24 under Diamond Harbour I Sub Division of Canals Division.