Loading…
Loading…
509 results • Recent activity
Urgent flood protection and mitigation work by closing Bank errossion30 M with repairing of damaged Embt on ExZamindary Embt at RBank of Burigang occurred due to rainfal, discharge from30.06.25 to 04.07.25 atMouza Bajirchak in GP10 No,Block-Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure 45 M on Ex Zamindary Embkt at R Bank of Tamal occurred due to rainfall and subsequent discharge from30.06.25 to 04.07.25 at Mouza Sarai, in G.P10 No, KeshpurBlock Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure 35M on Ex Zamindary Embkt at RBank of Tamal occurred due to rainfall and subsequent discharge from 30.06.25 to 04.07.25 at Mouza Sarai in G.P10 No Keshpur,Block-Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure55 M on Ex Zamindary Embkt at R Bank of Tamal occurred due to rainfall and subsequent discharge from 30.06.25 to 04.07.25 at Mouza Sarai, in G.P10 No Keshpur,Block-Keshpur
Urgent flood protection and mitigation work by emergent repair of slope faliure 65 M on Ex Zamindary Embkt at R Bank of Tamal occurred due to rainfall, subsequent discharge from 30.06.25 to 04.07.25 at Mouza Singpur in G.P9 NoAnandapur,Block-Keshpur
Urgent flood protection and mitigation work by repairing damaged IP of R Embkt of Bhosra Khal from Purba Dwar Khola to Chakrapan Nanda Bag House length of 3000M occurred due to rainfall, Mouza.Purbadar Khola, Briandapur, Chak Purusuttam,Chak Madhuri,