Loading…
Loading…
100 results • Latest
Pipe Distribution Network Gravity Main-I and Gravity Main-II on Left Bank Canal and Its Distributories of Nagan Medium Project Tal Navapur Dist Nandurbar
Detailed survey, investigation, revised design of the existing dam components, detailed cost estimate and taking its approval from competent authority for the Height Rising work of Shanimandal Minor Project Tal and Dist Nandurbar
22 LIS Scheme For Dhule and Nandurbar District
Construction of balance work of pick up wier with Right and Left Irrigation outlet of Dara medium Project
Providing and Fixing of New MS Needles of K.T Weirs Under Disaster Management for Nandurbar District
Providing and Fixing of New MS Needle of KT weir Under Disaster Management for Dhule District
Cleaning of earthen dam repairs and other ancillary works for Bhagadara MI Tank and Cleaning of earthen dam repairs and other ancillary works for Mohadi MI Tank and Repairs to the leakages from flank walls of Bhagadara MI Tank Tal Jamner Dist Jalgao
Bhagpur Lift Irrigation Scheme Stage-II Construction of Goltekadi MI Tank at Village Tal. Pachora Dist. Jalgaon and Construction of Ekulati Storage Tank at Village Ekulati Tal. Jamner Dist. Jalgaon With allied works including Forest Clearance
Cleaning Obstruction of Submergence Area at Right and Left side of Shelgaon Barrage Medium Project on Tapi River
Construction of Protective wall Pump house at the TIDC Rest house building and installation of Y- type barbed wire fencing on the protective compound wall at TIDC premises Jalgaon
Maintenance and Repairs of Pitching and Rock Toe of LHS and RHS Shelgaon Barrage Medium Project Tal and Dist Jalgaon
Repairs and maintenance of Gents and Ladies toilet block Tapi Hydroelectric and Lift Irrigation Division, Jalgaon at TIDC Office Building Tal and Dist. Jalgaon at
Repair and Maintenance to office buildings, Height Rising work of compound wall and other allied works at waghur colony, Nashirabad Tal.Jalgaon Dist.Jalgaon
Repair, Refurbishment, Testing. Commissioning of Pumping Machinery, Electrical Panels, Soft Starter and Compressor System at Gad17aon Branch of Waghur Lift Irrigation Scheme-1 Tal Jamner Dist. Jalgaon.
Repair, Replacement, Supply, Installation, Testing and commissioning of floating delivery hose pipe system and allied mechanical components at gadegaon branch of waghur lift irrigation scheme-1 Tal Jamner Dist. Jalgaon
Consultancy for Technical Legal and Statutory Processes for Denotification of Gravity Command and Notification of Upstream Command Area Under Irrigation Project as per Maharashtra Irrigation Act, 1976 and MMISF Act, 2005.
Repair to the Guide Wall of RBC of Chinchkheda Bandhara Tal. Jamner Dist. Jalgaon.
Prakasha Burai LIft Irrigation Scheme Constructon of Storage Tank at Aasane Tal Dist Nandurbar
Maintainance and Repair to spillway at Sarva Pimpri Minor Irrigation Project Tal Pachora Dist. Jalgaon
Carrying out maintenance and repair works of the Project Branch, Store Branch, Store Room, Drawing Branch, and Irrigation Branch buildings under the Irrigation Sub-Division Offices
Maintenance and repair works of the Bahula Medium Project earthen dam including the installation of a gauge plate for measuring the water level Taluka Pachora
Repairing work of syphon at Ch 195m Subminor of akulkheda 2 minor and Repairing work of VRB at Ch. 720 m on akulkheda 1 Minor and Other ancillary work
In 2026-27 CR Gate Operation at Ch 37677 and Irrigation, Non Irrigation Work at Tapi River Right Bank and Other Related Works On HRBC
Construction of Cart Track Bridge at Chainage 812m Over Canal of Pimpri MI Tank Tal.Jamner Dist-Jalgaon and Repairs to the Potholes Over Inspection path of Hiwarkheda M.I.Tank and repairs to the Inspection path and other ancillary works and Cleaning
Operation of irrigation outlet submersible pumps in gallery and Maintenance and repair work of Radial gates and complete electrical system of Hatnur Dam in the month of July 2026 to December 2026
Cleaning works of Sarvepimpri, Satgaon and Pimpalgaon Hareshwar Minor Irrigation Project, removal of silt from approach channels, installation of gauge plates for measuring water level, maintenance and repair and other ancillary works.
Carrying out maintenance and repair works of the Hivra Medium Irrigation Project, including installation of a gauge plate for measuring the water level, Taluka Pachora
Maintenance and repair works of the left and right side portions of the earthen dam of the Kalamsara Minor Irrigation Project including desilting of the approach channel installation of a gauge plate for water level measurement and road embankment
M and R to earthen Dam with cleaning and premosoon cleaning work of main canals Aqueduct, Pipe drain and Slab drain Nalla etc of Mangrul Dam And other allied works
M and R to Cleaning Left and Right flank of earthen and Saddle Dam and Foundation Hole removing silt from Gallary and Toe drain and other alied works of Mor Dam and In rainy season for operation of radial gates flood controlling and electrical arrang
Construction of CTC on Ch. 479, 2313, 3174 m of Kamalgaon Dy and other ancillary works
In 2026-27 CR Gate Operation at Ch.12950 and 22608 For Irrigation,Non Irraigation Work and Other Related Works On HRBC
Cleaning of earthen dam of Tondapur Medium Project and Work of Irrigation Management flood control and Other allied works in Rainy season 2026-27 for Tondapur Medium Project under Tondapur Irrigation Section and Cleaning of earthen dam repairs
Oiling and Greasing to Radial gate and repairing Stairs Of Gallery and Other Reparing Works Of Waghur Dam
Office and Site Work Of Waghur Dam For The Period Of July 2026 To December2026 and Providing Required Staff In Rainy Season For Gate Operation,Flood Control Electrical Related Maintanance and Repair Work At Waghur Dam
Excavation for Tail Channel and Approach Channel for Waste weir of Shevaga Pimpri and Godri M.I and other ancillary works and Cleaning of earthen dam repairs and other allied works of Gondegaon M.I. and Cleaning of earthen dam repairs and other allie
Construction and Repairing of Approach road pipe VRB Head wall of both side of Mangrul Dam
M and R To Suki Medium Project and Allied works
M and R to Abhora Medium Project and Allied works
Office work Irrigation and Non-Irrigation works in the month of July 2026 to June 2027 for Savda Section of Hatnur Project
Maintenance and Repair work of vertical porous drain pipes and foundation holes in the drainage gallery of Hatnur dam
Office work and Field work in the month of July 2026 to December 2026 for Hatnur Dam Section and Flood control work for Hatnur Dam Section during the period June 2026 to November 2026
Construction of Pipe Crossing Over Local Nalla in the submergence of Gondkhel-1 MI Tank Taluka Jamner Dist. Jalgaon
Construction of Gravity Closed Pipeline Distribution System from the Head Regulator of Padmalaya-II Dam for a Command Area of 1982 Ha. (ICA/CCA) under Padmalaya Lift Irrigation Scheme, Tal. Erandol, Dist. Jalgaon.
Waghur Project Construction of Balance Work of Gated Intake Structure, Forbay and Counterfort Retaining Wall of Waghur Lift Irrigation Scheme No. 1 (Hiverkheda Pump House) Tal.Jamner Dist.Jalgaon
Survey Design and Preparation of Detailed Estimates for Pipe Distribution Network System of Muktainagar Lift Irrigation Scheme Muktainagar
Maintenance and repair works of the Raver, Dharni sub-divisions and Drawing Branch under the Tapi Valley Survey and Investigation Divisional Unit Jalgaon, Including the Divisional Office.Tal.Jalgaon Dist.Jalgaon
M.I.Tank Kang Tal.Jamner Dist.Jalgaon Constructing Cement Concrete Gutter to the Approach Road from Godri village to Dam site.
Construction of WBM Approach Road At.M.I.Tank Odhare Tal.Chalisgaon Dist.Jalgaon
Cleaning and Removing wet silt from Canal of M.I. Tank Kodgaon Tal.Chalisgaon Dist.Jalgaon