Loading
Loading…
Loading…
1,333 results • Recent activity
TTPS Mech II BM Conducting load testing of 10 Ton Capacity EOT crane at workshop during the year 2025 2026
Construction of Office Building for Section Officers of EM 1
TTPS Mech II TM I Clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit I II III for the period from 01 04 2026 to 31 03 2027
SUPPLY OF FINNED ECONOMIZER COIL J BEND OF SIZE 44.5 X 4.5 MM, MATERIAL SA 210 GR A1 RADIUS 180 degree PITCH 228 MM FOR UNIT II BOILER
CE SE C TTPS Spec.No. 70 26 27
CE SE C TTPS Spec.No. 68 26 27