Loading…
Loading…
1,333 results • Recent activity
TTPS Mech II BM Unit II Inspection Rectification of emitting electrode suspension frame in ESP during annual overhaul for the year 2025 2026
TTPS Mech II BM Unit II Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan A
TTPS Mech II TM I Unit I Reconditioning of RC Valve plug with stem and soft seat of RC valve Model No 87 79006-series retrieved from Boiler Feed Pump system
TTPS Mech II AHP Unit I Annual overhauling works of pumps valves in sea water Booster Pumps during the forthcoming overhaul
TTPS Mech II AHP Unit I Annual overhauling works Cleaning of Ash Water Pump House Sump during forthcoming overhaul
TTPS Mech II AHP Unit I Cleaning of Ash Slurry sluice Sump of Unit I during forthcoming overhaul